Similar Projects
Boiler Replacement at Cherry Hill Elementary School and Roosevelt Elementary School
Renovation
Design
$3,130,000 CJ est. value
River Edge, NJ 07661

Hot Water Storage Tank & Domestic Hot Water Heater Replacement
Renovation
Sub-Bidding
$60,000 CJ est. value
Cliffside Park, NJ 07010

HVAC Maintenance and Repair
Term Contract
Sub-Bidding
Fair Lawn, NJ 07410

HVAC and Mechanical Products
Term Contract
Post-Bid

Hydrogen Peroxide Air Filtration & Disinfection Products
Post-Bid

HVAC Renovations at the Franklin Elementary School and Helen I. Smith Elementary School
Results
$500,000 est. value
Saddle Brook, NJ 07663

Bi-Polar Ionization Upgrades for Existing Roof Top Units
Results
Paramus, NJ 07652

Provide On-Call HVAC and Preventative Maintenance Services
Term Contract
Sub-Bidding
Paramus, NJ 07652

Furnish and Deliver Various MERV 13 HVAC Filters, On an As Needed Basis
Term Contract
Post-Bid
Hackensack, NJ

HVAC Preventive Maintenance Services
Term Contract
Results
Cliffside Park, NJ

Rooftop Unit Replacement at Godwin School and Midland Park High School
Renovation
Sub-Bidding
$600,000 CJ est. value
Midland Park, NJ 07432

Weatherization Energy Conservation Project 2021-2022
Post-Bid

HVAC Upgrades at Sicomac Elementary School - Phase II
Results
$400,000 est. value
Wyckoff, NJ 07481

Heating and Cooling Systems Maintenance
Post-Bid
Hackensack, NJ

Building Management System
Results

Last Updated 09/01/2022 06:04 PM
Project Title

Boiler Replacement at Jackson Avenue School

Physical Address View project details and contacts
City, State (County) Hackensack, NJ 07601   (Bergen County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $994,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

HACKENSACK PUBLIC SCHOOLS HACKENSACK, NEW JERSEY Bidding Documents may be examined at the office of DMR Architects, 777 Terrace Ave., 6th Floor, Hasbrouck Heights, New Jersey 07604, during business hours. A copy thereof may be procured on/after July 13, 2022 at the Architect's office for the purpose of bidding. If the Contract is awarded to the Bidder, he will within two (2) weeks thereafter execute such Contract and furnish satisfactory Performance Bond. Upon failure to do so, he shall forfeit the deposit as liquidated damages and the acceptance of the bid will be contingent upon the fulfillment of this requirement by the Bidder. No interest shall be allowed upon any such certified check or cash. The successful Bidder shall be required to comply with the provisions of the New Jersey Prevailing Wage Act, Chapter 150 of the Laws of 1963, effective January 1, 1964, and with the requirements of P.L. 1975.C.17 (N.J.A.C. 17:27), Affirmative Action Program. All bids shall be stated in words and figures on bid forms provided. Bidding shall be in conformance with the applicable requirements of N.J.S.A. 18A:18A-1, et seq. which pertain to the Public-School Contracts Law. Hackensack Public Schools Board of Education reserves the right to reject any and all bids or proposals to waive any minor irregularities in any bid proposal if it is considered in the best interest of the Board to do so. No bid shall be deemed accepted or a Contract awarded until public adoption of the resolution to that effect by the Hackensack Public Schools Board of Education.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents