Similar Projects
Last Updated | 05/12/2021 12:49 PM |
Project Title | 2021 Pathways Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | Princeton, NJ (Mercer County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project provides for all items related to repairs and/or replacements of HMA pathways and ADA curb ramps on various, non-contiguous municipal streets and easement areas. The principal items of work consist of the following: 110 CY of Excavation, Unclassified; 776 SY of Dense Graded Aggregate Base Course, 5” thick; 3,608 SY of HMA Milling, 3” or less; 5 tons of HMA 9.5M64 Surface Course, 2” thick; 13 tons of HMA 19M64 Base Course, 5” thick; 61 SY of Concrete Sidewalk, 5” thick; 30 units of Detectable Warning Surfaces; 4,934 SY of Hot Mix Asphalt Sidewalk, 2” thick; 440 LF of Sealing of Cracks in Hot Mix Asphalt Surface Course; 86 LF of Concrete Curb; 84 LF of Belgian Block Curb; 2,360 SY of Topsoil Spreading (Topsoiling, Fertilizer, Straw Mulch, Tackifier), 5” thick; and other related miscellaneous work. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |