Last Updated 05/12/2021 12:49 PM
Project Title

2021 Pathways Improvement Project

Physical Address View project details and contacts
City, State (County) Princeton, NJ   (Mercer County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project provides for all items related to repairs and/or replacements of HMA pathways and ADA curb ramps on various, non-contiguous municipal streets and easement areas. The principal items of work consist of the following: 110 CY of Excavation, Unclassified; 776 SY of Dense Graded Aggregate Base Course, 5” thick; 3,608 SY of HMA Milling, 3” or less; 5 tons of HMA 9.5M64 Surface Course, 2” thick; 13 tons of HMA 19M64 Base Course, 5” thick; 61 SY of Concrete Sidewalk, 5” thick; 30 units of Detectable Warning Surfaces; 4,934 SY of Hot Mix Asphalt Sidewalk, 2” thick; 440 LF of Sealing of Cracks in Hot Mix Asphalt Surface Course; 86 LF of Concrete Curb; 84 LF of Belgian Block Curb; 2,360 SY of Topsoil Spreading (Topsoiling, Fertilizer, Straw Mulch, Tackifier), 5” thick; and other related miscellaneous work.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents