Similar Projects
Last Updated | 01/07/2022 05:50 PM |
Project Title | Water Filtration Plant Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Everett, WA (Snohomish County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Water Filter Plant Phase 2 Capital Upgrades project consists of a suite of improvement projects that are recommended to be designed and constructed concurrently. The need to construct these projects concurrently is due to the criticality of the infrastructure being upgraded, the complexity and proximity of the individual projects, and the importance of maintaining uninterrupted water filter plant operations throughout project construction efforts. The individual projects fall within the heavy civil construction category and include large diameter valve replacement, large diameter pipe construction, water treatment process system modifications, concrete construction, pile driving, deep soil excavation in locations with high groundwater, chemical storage tank and support piping replacement, and building modifications. |
||||||||||||||||||||||||||||||||||||||||||||||||||||
Details | Water Treatment Plant, New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |