Similar Projects
Erich Lindemann Building - Existing Fuel Oil System Upgrades Project
Infrastructure
Bidding
$173,105 est. value
Boston, MA

Preventative Maintenance and Service for 7 Natural Gas Fired Furnaces and 1 Oil Fired Clean Burn Unit Located in Various Buildings
Post-Bid
Less than $45,000 est. value
Tewksbury, MA

Removal of Existing Vaulted AST Oil Storage Tank
Post-Bid
Bolton, MA

Emergency Spill Response and Underground Vault/Manhole Pump Out Services
Term Contract
Results
Holyoke, MA

Polyaluminum Chloride Storage Tank Improvements
Results
Less than $150,000 est. value
North Andover, MA 01845

Vernon Street Gas Regulator Station Installation
Post-Bid
Less than $1,250,000 est. value
Wakefield, MA 01880

Monson Development Center - Landfill and Fuel Storage Tank Closure
Results
Less than $1,329,350 est. value
Palmer, MA

Standby Generator Fuel Tank Replacement
Post-Bid
Less than $45,000 est. value
North Attleborough, MA 02760

WPCF Fuel Tank and Concrete Vault Removal
Results
Less than $75,000 est. value
Turners Falls, MA 01376

Natural Gas Regulator Station
Post-Bid
$150,000 est. value
Wakefield, MA 01880

Underground Storage Tank Removal & Retaining Wall Reconstruction, Jean Elder 667-3
Results
$30,350 est. value
Amherst, MA

Gas Main Replacements
Post-Bid
Wakefield, MA

Diesel Exhaust Fluid Tank
Results
Boston, MA 02129

Z1GC--Fuel Reconditioning
Post-Bid
Boston, MA

Removal of One 12,000 Gallon Double Walled, Fiberglass, No. 2 Fuel Oil Underground Storage Tank
Results
Less than $30,000 est. value
Agawam, MA

Last Updated 09/20/2021 08:50 AM
Project Title

Underground Storage Tank Removal

Physical Address View project details and contacts
City, State (County) Medford, MA 02155   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $60,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Willis Avenue Federal Family Development Underground Storage Tank Removal Excavation, Removal and Closure of two 8,000 gallon underground storage tanks.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents