Similar Projects
Holt Fire Station
New Construction
Conception
$813,000 est. value
Holt, FL

Longwood Fire Station 15/Public Safety Facility
New Construction
Conception
Longwood, FL

New Police Facility
New Construction
Design
Tallahassee, FL

Fire Station 11
New Construction
Design
Orlando, FL

Fire Station 39 - Construction Manager at Risk Services
Renovation
Bidding
Largo, FL 33779

Orange County Fire Station - 54 Metal Storage Building Replacement
Renovation
Bidding
$192,000 est. value
Orlando, FL 32821

Cocoa Beach Police Headquarters
New Construction - 28,900 SF
Post-Bid
Less than $8,500,000 est. value
Cocoa Beach, FL

Town of Windermere Town Facilities
New Construction - 9,882 SF
Post-Bid
$5,200,000 est. value
Windermere, FL

Consultant Services for a New Police Headquarters
New Construction - 225,000 SF
Results
Fort Lauderdale, FL 33301

Sheriff`s District 2 Administration and Operations Center
New Construction - 51,000 SF
Results
Less than $21,000,000 est. value
Bunnell, Palm Coast, FL 32137

Replace Fire Crash Rescue Station, 125th Fighter Wing, Jacksonville, FL
New Construction - 17,400 SF
Construction
$5,000,000 to $10,000,000 est. value
Jacksonville, FL 32218

Construction of Bonaventure Fire Rescue Station No. 21
New Construction - 12,578 SF
Construction
Less than $5,250,000 est. value
Weston, FL 33326

Fire Station 17 and Community Resilience Center
New Construction
Conception
Tallahassee, FL 32310

Orlando Fire Station 6
New Construction
Design
Orlando, FL

New Police Department
New Construction - 24,572 SF
Post-Bid
$8,200,000 est. value
Palmetto, FL 34221

Last Updated 11/27/2021 02:01 AM
Project Title

Modular Building Relocation

Physical Address View project details and contacts
City, State (County) Longwood, Sanford, FL 32750   (Seminole County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To breakdown, transport and setup a modular building from a Fire Training Center located at 205 Valentine Way, Longwood FL, 32750 and relocate it to 577-599 Yankee Lake Rd, Sanford, FL, 32771. Breakdown will include cleaning lot of any debris, anchors, blocks, etc., at the old site. • Permit running and processing • Foundation dirt pad leveled and compacted • Block and tie according to provided plans • Replace siding and roof cap • Replace interior trim along marriage line • Demolish and remove all items specified on plans • Install 2 new wider doors • Repair damaged exterior wall near A/C unit • Sewer and water ran within 10’ of the edge of the building • Vinyl skirting once inspections are completed • New A/C unit install – 3 ton unit

Details

Fire/Police Station, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents