Similar Projects
Last Updated | 03/28/2019 05:51 AM |
Project Title | Traffic Signal Update (BDI) |
Physical Address | View project details and contacts |
City, State (County) | FL (Duval County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Traffic Signalization |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $418,196 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Contract consist of curb and gutter, traffic signal, lighting, highway signing, sidewalk, and other incidental construction on SR 10 Atlantic Blvd at Queens Harbor intersection in Duval County. Section 0001 Roadway 0101- 1- Mobilization (44119515201) Ls 1.000 0102- 1- Maintenance Of Traffic (44119515201) Ls 1.000 0102- 14- Traffic Control Officer Hr 16.000 0102- 60- Work Zone Sign Ed 2,995.000 0102- 74- 1 Channelizing Device- Types i, Ii, Di, Vp, Drum, Or Lcd Ed 3,420.000 0102- 74- 7 Channelizing Device- Pedestrian Lcd (Longitudinal Channelizing Device) Lf 100.000 0102- 76- Arrow Board / Advance Warning Arrow Panel Ed 100.000 0102- 99- Portable Changeable Message Sign, Temporary Ed 200.000 0104- 10- 3 Sediment Barrier Lf 162.000 0104- 18- Inlet Protection System Ea 3.000 0107- 1- Litter Removal Ac 5.820 0107- 2- Mowing Ac 4.440 0110- 2- 2 Selective Clearing And Grubbing, Areas With Trees To Remain Ac 0.010 0110- 4- 10 Removal Of Existing Concrete Sy 99.000 0162- 1- 11 Prepared Soil Layer, Finish Soil Layer, 6" Sy 58.000 0520- 1- 10 Concrete Curb & Gutter, Type f Lf 98.000 0522- 1- Concrete Sidewalk And Driveways, 4" Thick Sy 27.000 0522- 2- Concrete Sidewalk And Driveways, 6" Thick Sy 34.000 0527- 2- Detectable Warnings Sf 38.000 0570- 1- 2 Performance Turf, Sod Sy 58.000 0999- 25- Initial Contingency Amount, Do Not Bid (44119515201) Ls 1.000 Section 0002 Signing 0700- 3-201 Sign Panel, Furnish & Install Overhead Mount, Up To 12 Sf Ea 3.000 0700- 5- 22 Internally Illuminated Sign, Furnish & Install, Overhead Mount, 12-18 Sf Ea 3.000 0706- 3- Retro-Reflective/Raised Pavement Markers Ea 23.000 0711- 11-125 Thermoplastic, Standard, White, Solid, 24" For Stop Line And Crosswalk Lf 136.000 0711- 11-170 Thermoplastic, Standard, White, Arrow Ea 1.000 0711- 14-123 Thermoplastic, Preformed, White, Solid, 12" For Crosswalk Lf 425.000 0711- 14-125 Thermoplastic, Preformed, White, Solid, 24" For Crosswalk Lf 360.000 0711- 16-101 Thermoplastic, Standard-Other Surfaces, White, Solid, 6" Gm 0.078 0711- 17- Thermoplastic, Remove Existing Thermoplastic Pavement Markings: Non-Conflicting Only Sf 729.000 Section 0003 Signalization 0630- 2- 11 Conduit, Furnish & Install, Open Trench Lf 180.000 0630- 2- 12 Conduit, Furnish & Install, Directional Bore Lf 435.000 0632- 7- 1 Signal Cable- New Or Reconstructed Intersection, Furnish & Install Pi 1.000 0632- 7- 6 Signal Cable, Remove- Intersection Pi 1.000 0633- 1-420 Fiber Optic Cable, Relocate, Underground Lf 60.000 0633- 2- 32 Fiber Optic Connection, Install, Termination Ea 12.000 0633- 3- 12 Fiber Optic Connection Hardware, f&i, Splice Tray Ea 2.000 0633- 3- 14 Fiber Optic Connection Hardware, f&i, Buffer Tube Fan Out Kit Ea 2.000 0633- 3- 16 Fiber Optic Connection Hardware, f&i, Patch Panel- Field Terminated Ea 1.000 0635- 2- 11 Pull & Splice Box, f&i, 13" x 24" Cover Size Ea 22.000 0635- 2- 12 Pull & Splice Box, f&i, 24" x 36" Cover Size Ea 1.000 0639- 1-123 Electrical Power Service, f&i, Underground, Meter Not Required As 1.000 0639- 2- 1 Electrical Service Wire, Furnish & Install Lf 25.000 0641- 2- 12 Prestressed Concrete Pole, f&i, Type p-Ii Service Pole Ea 1.000 0646- 1- 11 Aluminum Signals Pole, Pedestal Ea 4.000 0646- 1- 60 Aluminum Signals Pole, Remove Ea 2.000 0649- 21- 1 Steel Mast Arm Assembly, Furnish And Install, Single Arm 30` Ea 1.000 0649- 21- 10 Steel Mast Arm Assembly, Furnish And Install, Single Arm 60` Ea 1.000 0649- 21- 21 Steel Mast Arm Assembly, Furnish And Install, Single Arm 78` Ea 1.000 0649- 26- 3 Steel Mast Arm Assembly, Remove, Shallow Foundationbolt On Attachment Ea 2.000 0650- 1- 14 Vehicular Traffic Signal, Furnish & Install Aluminum, 3 Section, 1 Way As 9.000 0653- 1- 11 Pedestrian Signal, Furnish & Install Led Countdown, 1 Way As 4.000 0660- 1-109 Loop Detector Inductive, f&i, Type 9 Ea 7.000 0660- 1-110 Loop Detector Inductive, f&i, Type 10 Ea 1.000 0660- 2-102 Loop Assembly, f&i, Type b As 12.000 0660- 2-106 Loop Assembly, f&i, Type f As 1.000 0660- 3- 11 Vehicle Detection System- Microwave, Furnish & Install Cabinet Equipment Ea 1.000 0660- 3- 12 Vehicle Detection System- Microwave, Furnish & Install, Above Ground Equipment Ea 1.000 0663- 1-121 Signal Priority And Preemption System, Furnish And Install, Gps, Replace Cabinet Electronics Ea 1.000 0663- 1-122 Signal Priority And Preemption System, Furnish And Install, Gps, Detector Ea 1.000 0665- 1- 11 Pedestrian Detector, Furnish & Install, Standard Ea 4.000 0670- 5-111 Traffic Controller Assembly, f&i, Nema, 1 Preemption As 1.000 0670- 5-600 Traffic Controller Assembly, Remove Controller With Cabinet As 1.000 0682- 1-112 Its Cctv Camera, f&i, Dome Enclosure - Pressurized, Ip, Standard Definition Ea 1.000 0684- 1- 1 Managed Field Ethernet Switch, Furnish & Install Ea 1.000 1000- 7- Utility Work- Jpa/Utility Agreement, Power (44119515201) Ls 1.000 | ||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |