Similar Projects
Sugar Bear Drive Sanitary Sewer Pipe Repairs and Scott Street Utility Repairs
Post-Bid
Safety Harbor, FL

Private Lateral Line Rehabilitation Project
Post-Bid
Saint Petersburg, FL 33731

2018 Sewer Point Repair and Improvements
Results
$1,000,000 to $5,000,000 est. value
Clearwater, FL 33755

Service Line Warranty Program - Utilities - Co-Op
Term Contract
Results
FL

Grease Waste Piping Renovations
Post-Bid
Less than $200,000 est. value
Clearwater, FL 33759

J--Grease Trap Cleaning Service
Results
Bay Pines, FL 33744

North Bayshore Sanitary Sewer and Force Main Replacement Project
Results
Less than $1,490,000 est. value
Safety Harbor, FL

San Priority Area Repair and Replace
Results
$3,600,000 est. value
Saint Petersburg, FL

Pump Station 016\Park Boulevard Force Main to South Cross Bayou Replacement
Results
Less than $16,745,920 est. value
Pinellas Park, FL 33781

Sewer Interceptor Rehabilitation - 94th Avenue to 86th Avenue and 86th Avenue to Pump Station 069
Results
Less than $1,218,025 est. value
FL

Manhole Rings, Covers, and Related Products
Results
Clearwater, FL 33758

Lift Station 3 Sanitary Sewer Force Main Replacement Project
Results
Less than $290,000 est. value
Dunedin, FL 34698

Annual Sanitary Sewer Repair and Extension
Term Contract
Results
Less than $400,145,650 est. value
Clearwater, FL 33755

Sewer Interceptor Rehabilitation - North Lake Seminole (Pid # 002747E)
Results
$547,896 est. value
FL

Maintenance Services Sanitary Sewer Cleaning
Results
Saint Petersburg, FL 33731

Last Updated 03/01/2019 07:41 AM
Project Title

102nd Avenue and Bryan Dairy Road Sewer Lining Project

Physical Address View project details and contacts
City, State (County) FL   (Pinellas County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $812,614
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Work consists of cleaning, videoing, and installing cured in place pipe (CIPP) in existing 8" and 10" gravity sewers; cutting in lateral connections to the newly installed CIPP liners, rehabilitating manholes, raising manholes to grade, locating manholes, and all the appurtenant work associated with this type of work including, but not limited to, temporary bypass pumping or hauling, temporary pipelines, force main tapping, maintenance of traffic, and all permitting efforts required to perform the Work.
Details
Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents