Similar Projects
Non-Potable Reservoir Pump Station
Post-Bid
Brighton, CO 80601

Marcy Gulch Lift Station Project
New Construction
Post-Bid
Highlands Ranch, CO 80129

Grandview Pump Station Phase I: Building Improvements and/or Phase 2 and Site Improvements Projects
Renovation
Results
Durango, CO 81301

Lift Station Pump Replacement
Results
Denver, CO 80202

Glenview Owners` Association Booster Pump Station
Construction
Less than $420,000 est. value
Buena Vista, CO

Binney Connection Project Treatment and Pumping Package
New Construction
Post-Bid
$19,000,000 est. value
Aurora, CO 80010

Smoky Hill Pump Station Improvements
Results
$3,200,000 to $3,670,000 est. value
Aurora, CO 80012

The Lakes at Centerra Metropolitan District Lakes Phase 7 Non-Potable Pump House
Post-Bid
Loveland, CO 80537

Gun Club Road Pump Station Major Improvements Project
Results
$5,000,000 to $5,400,000 est. value
Aurora, CO

Waterbury Lift Station 2019 Repairs
Post-Bid
Centennial, CO 80011

Ridgegate First Street Lift Station
Results
Lone Tree, CO

On-Call General Construction Services
Term Contract
Post-Bid
Brighton, CO 80601

Oak Grove Elementary School Christmas Break Sewage Lift Station Upgrade Project
Results
Montrose, CO

United Reservoir North Cell Pump Station
Post-Bid
Greenwood Village, CO

Lift Station Upgrades Project in Greenwood Village
Results
Less than $1,544,555 est. value
Greenwood Village, CO

Reported 12/21/2019 12:00 AM
Project Title

Lift Station A And Force Main Project

Physical Address View project details and contacts
City, State (County) Northglenn, CO 80241   (Adams County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Lift Station A and Force Main Project (Project) is in Adams County, within the City limits of Northglenn. The project is comprised of two project Phases as described below: Lift Station Phase: The proposed 10.5 MGD Lift Station consists of the following components: Four submersible pumps located in a dual chamber cast-in-place concrete wet well. Electrical and Controls Enclosure housing switch gear, VFDs, and local controls. An emergency / backup generator capable of providing full electrical loads. Valve and metering vaults. 8- to 20-inch PVC or DIP process and buried site piping and fittings. Surge / Transient mitigation equipment. The preliminary cost range for the Lift Station Phase is $8,000,000 - $10,000,000. 1.7.1.2 Force Main Phase: The proposed Force Main consists of the following components: Approximately 14,000 lineal feet of 16- to 20-inch PVC or DIP buried pipe. The potholing of numerous existing utilities The installation of buried pipe in congested road right-of-way. The trenchless crossing of 120th Avenue. Traffic control. Pavement restoration. The preliminary cost range for the Lift Station Phase is $12,000,000 - $15,000,000.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents