Similar Projects
Plumbing Shop Exhaust Updates
Bidding
$75,000 est. value
Lowell, MA

Energy Recovery Unit Replacements at Hudson High School
Bidding
$700,000 est. value
Hudson, MA 01749

Maintenance and Service of Rink Refrigeration Systems
Post-Bid
Less than $1,500,000 est. value

Framingham High School HVAC Upgrades - General Bids
Post-Bid
Framingham, MA 01702

Crocker Hall Interior Renovations Phase 1 - Filed Sub-Bids
Results
Less than $660,000 est. value
Framingham, MA

Solomon Building Boiler Replacement - General Bids
Results
Less than $1,000,000 est. value
Cambridge, MA 02138

Design and Construction of Diffused Aeration/De-Stratification System for Town Reservoir
Bidding
Wakefield, MA

Water Treatment Plant Ozone and Plant Upgrades - Sub-Bids
Post-Bid
Billerica, MA

UMass Amherst Mount Ida Campus Building 770 Room 118 HVAC
Results
$240,000 est. value
Newton, MA 02459

Capen Court Air-Cooled Chiller Compressor Replacement
Bidding
$16,500 est. value
Somerville, MA 02144

Corrective Maintenance HVAC Systems Service
Term Contract
Post-Bid
Less than $700,000 est. value
Framingham, MA 01702

Bemis Water Treatment Plant - Filed Sub Bid
Results
Less than $7,400,000 est. value
Pepperell, MA 01463

North High School Chiller and Related Equipment Service
Bidding
$125,000 est. value
Newton, MA

HVAC Replacement - Two Systems
Post-Bid
Less than $45,000 est. value
Stow, MA 01775

Z--Rehab HVAC System, Assabet NWR, Sudbury MA
Results
Sudbury, MA

Last Updated 11/25/2020 10:23 AM
Project Title

Rehabilitate Visitor Center HVAC System, LOWE

Physical Address View project details and contacts
City, State (County) Lowell, MA   (Middlesex County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work includes replacement of the HVAC system at the Visitor Center, including rooftop equipment, air handling equipment, and terminal units. Ductwork adjustments are included, along with associated electrical work. General construction includes modifications to doors and partitions, windows and louvers, and painting. The existing condition of all areas affected by the project activities will be documented in advance of the start of construction. All park property will be restored to pre-construction conditions unless otherwise agreed upon between the NPS and Construction Contractor in writing.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents