Similar Projects
Wolf Creek Raw Water Main - General Construction
Infrastructure
Bidding
$1,400,000 to $1,600,000 est. value
Port Carbon, PA 17965

2021 Lead Joint Waterline Replacement Project
Infrastructure
Bidding
Coraopolis, PA 15108

Pipe Installed
Post-Bid
Honesdale, PA 18431

Analysis Water Samples
Post-Bid
Harrisburg, PA

2020 Water Main Renewal Project
Results
$1,250,000 to $1,500,000 est. value
Chester, PA 19016

University Drive Road / Curb And Waterline Loop Repairs Sitework
Results
$900,000 est. value
Hazleton, PA 18202

Bartram's Mile Maintenance Building and Water Service Extension
Renovation
Construction
$43,000,000 est. value
Philadelphia, PA 19143

Water Transmission and Distribution Systems Materials Contract
Term Contract, Infrastructure
Bidding
Lancaster, PA

Water System Interconnect Project
Post-Bid
Mill Hall, PA 17751

Water Main Relocation
Results
Shrewsbury, PA 17361

Emergency Generator and Fire Pump Maintenance Services
Term Contract
Bidding
Philadelphia, PA 19107

Cold Water Meters
Post-Bid
Sewickley, PA 15143

General Construction for Scum Concentration and Collection System Betterment
Results
$2,000,000 to $3,000,000 est. value
Philadelphia, PA

Waterline Relocation Project
Infrastructure
Bidding
PA

Installation of 400' of 6" C900, DR14, PVC pipe along Washington Lane, Franklin Park Borough
Post-Bid
Franklin Park, PA 15237

Last Updated 12/07/2021 04:01 PM
Project Title

Mt. Carbon Truss Bridge Water Main Relocation

Physical Address View project details and contacts
City, State (County) PA   (Schuylkill County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of the relocation of an existing 12-inch water main currently attached to the downstream face of the Mount Carbon Bowstring Truss Bridge across the Schuylkill River with a 14-inch HDPE water main immediately upstream of the existing truss bridge. The 14-inch water line will be installed by directional drill under the river. The relocated water main will connect to existing water mains along State Route (S.R.) 2015 and S.R. 61. The Project includes construction of approximately 239 lineal feet of 14-inch HDPE water main by directionally controlled horizontal drilling method, 112 lineal feet of 12 inch, 12 lineal feet of 6 inch, and 14 lineal feet of 8 inch ductile iron pipe water main installed by open cut method, water main appurtenances including gate valves, insertion valves, new and reconnection of water service lines, and incidental work including seeding and paving replacement in state roadways.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents