Similar Projects
Last Updated | 10/09/2020 10:57 AM |
Project Title | Auds Creek Watershed, Site 5 and Pine Creek Watershed, Site 3 Dam Repairs |
Physical Address | View project details and contacts |
City, State (County) | TX (Lamar County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dam/Tunnel |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Auds Creek 5 - removing a portion of the downstream slope and replacing it with compacted lime-treated earthfill. The principal spillway inlet tower trash rack and gate valve will be removed and replaced. And, the barbed-wire fence surrounding the dam and auxiliary spillway will be removed and replaced. Pine Creek 3 - reshaping the plunge pool and crossing berm and installing a rock lined plunge basin and outlet channel. The principal spillway inlet tower trash rack will be removed and replaced. A small portion of the existing barbed-wire fence will be removed and replaced to facilitate the reconstruction of the crossing berm which is located between the dam and the plunge basin. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |