Similar Projects
Parking Lot C-3 Improvements 2022
Infrastructure
Bidding
Champaign, IL 61820

2022 Road District Maintenance Program - FOB - Bituminous Materials
Alteration
Bidding
IL

2021-2022 Miscellaneous Repair Contract
Term Contract
Post-Bid
Urbana, IL

Central Division - Asphalt Paving Maintenance
Post-Bid

St. Mary's Road Neil to Oak Reconstruction
Results
Champaign, IL

Resurfcing Maplewood Drive From the North City Limits of Rantoul to Veteran's Parkway in Rantoul
Results
Rantoul, IL

Indian Grocery Store
Renovation, Alteration - 5,000 SF
Construction
Champaign, IL 61820

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Ramp Construction
New Construction
Results
Less than $2,421,144 est. value

South Mahomet Road Utility Extensions
Post-Bid
Mahomet, IL 61853

2021 General HMA Paving
Results
Less than $241,920 est. value
Mahomet, IL

2021 Infrastructure Maintenance
Post-Bid
Champaign, IL

Microsurfacing and Manhole Adjustments
Results
Less than $247,413 est. value
Mahomet, IL

2021 Asphalt Sealing
Post-Bid
Less than $15,000 est. value
Champaign, Urbana, IL 61822

2021 Bituminous Street Improvements
Results
Champaign, IL

Last Updated 03/25/2022 02:36 AM
Project Title

2022 Concrete Street Improvements

Physical Address View project details and contacts
City, State (County) Champaign, IL 61822   (Champaign County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Concrete, Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Approximately 2,041.5 Ft of PCC removal and replacement; 4,369 Sq Yd of Agg Base Course Ty A 6"; 5,128 Sq Yd of Agg Base Course Ty A 12"; 3,537 Sq Yd of PCC Pavement 8"; 4,686 Sq Yd of PCC Pavement 9" (Jointed); 3,328 Ft of Comb Conc C&G; 3,076 Sq Ft of PCC Sidewalk 6"; 5,072 Ft Pavement Marking; 1,085 Sq Yd of Sodding; and other miscellaneous construction items. This project has a DBE utilization goal of 4% set in conjunction with the Illinois Department of Transportation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents