Similar Projects
Gulf Intracoastal Waterway Fy19 Corpus Christi to Port Isabel and the Channel to Harlington
Design
$5,000,000 to $10,000,000 est. value
Corpus Christi, TX

Fy21 Houston Ship Channel Exxon to Carpenters - Dredging
Design
$5,000,000 to $10,000,000 est. value
Houston, TX

Dredge Boat Basin USCG Station Houston, TX
Bidding
$250,000 to $500,000 est. value
Houston, TX

Freshwater Mussel Survey and Aquatic Species Resource Relocation Services
Term Contract
Bidding
Waco, TX

SNWW, Texas, River Channel Anchorage and Turning Basin
Post-Bid
$10,000,000 to $25,000,000 est. value
TX

Annual Dredging Services
Term Contract
Post-Bid
Corpus Christi, TX 78403

Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple Award Task Order Contracts (MATOC) for Rapid Response Hopper Dredging Due to Unanticipated Shoaling and Shore Protection Projects in Multiple Locations within the Boundaries of the Galveston District
Results
$3,000 to $25,000,000 est. value
Corpus Christi, Freeport, Galveston, Matagorda, TX 77550

Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple Award Task Order Contracts (MATOC) for Rapid Response Hopper Dredging Due to Unanticipated Shoaling and Shore Protection Projects in Multiple Locations within the Boundaries of the Galveston District
Results
$3,000 to $25,000,000 est. value
Corpus Christi, Freeport, Galveston, Matagorda, TX 77550

FY 21 Pipeline Dredging Deep Draft Houston Ship Channel - Greens Bayou to Sims Bayou Harris, County, Texa
Design
$5,000,000 to $10,000,000 est. value
TX

Ship Dock Basin Maintenance Dredging
Bidding
Galveston, TX

Freeport Harbor, Texas, Channel Improvement Project, Reach 3 Lower Stauffer Channel in Brazoria County, Texas, Pipeline Dredging.
Post-Bid
$10,000,000 to $25,000,000 est. value
TX

Mouth of Colorado Maintenance Dredging
Results
$5,000,000 to $10,000,000 est. value
TX

Marina Breakwater at McGee Beach Improvements and Boat Basin Dredging
Bidding
Corpus Christi, TX

Single Award Task Order Contract (SATOC) for Mechanical Dredging for the US Army Corps of Engineers, Galveston District and the Southwestern Division.
Post-Bid
$5,000,000 to $10,000,000 est. value
Galveston, TX

Removing Sediment from the Rio Grande Hudspeth County
Results
TX

Reported 06/10/2020 11:14 AM
Project Title

FY20 GIWW Rollover to Causeway Maintenance Dredging - Pipeline Dredging

Physical Address View project details and contacts
City, State (County) (Chambers, Galveston Counties)
Category(s) Heavy and Highway
Sub-Category(s) Dredging
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

USACE Galveston District, FY20 GIWW Rollover to Causeway Maintenance Dredging Galveston and Chambers Counties, Texas, Pipeline Dredging: Schedule 1 - Maintenance dredging of seventeen sections varying locations between station 166+000 and 321+000 totaling approximately 980,000 CY. Of the total, approximately 400,000 CY is in the sections covering the Bolivar Flare. Placement areas are primarily upland confined (PAs 35, 36, 42), semi confined (PA 43), and potential beach placement of 160,000 CY at Rollover Pass. - Option 1 - Galveston Alternate Route. Maintenance dredging of approximately 300,000 CY with open water placement at PA 50. An additional 35 calendar days will be added to contract duration if awarded. - Option 2 - Offats Bayou Main Channel w/ East Wye and West Wye. Maintenance dredging of approximately 100,000 CY with open water placement at PA 53. An additional 20 calendar days will be added to contract duration if awarded. - Option 3 - North Ferry Channel (Bolivar Ferry Channel) Maintenance dredging of approximately 210,000 CY with open water placement at PA 43. An additional 35 calendar days will be added to contract duration if awarded. - Option 4 - Beneficial use beach placement of approximately 100,000 CY vicinity of Rollover Pass in lieu of upland placement at Placement areas 35 and 36. An additional 15 calendar days will be added to contract duration if awarded. - Option 5 - Pierce Marsh Restoration Cell 1 - Maintenance dredging of approximately 130,000 CY from GIWW station 385+000 to station 398+000. Material to be placed at Pierce Marsh Cell 1 for marsh restoration. Option includes raising approximately 7,500 ft of existing perimeter containment berms. An additional 55 calendar days will be added to contract duration if awarded. - Option 6 - Pierce Marsh Restoration Cell 2 - Maintenance dredging of approximately 80,000 CY from GIWW station 370+400 to station 374+400 and 398+000 to 402+000. Material to be placed at Pierce Marsh Cell 2 for marsh restoration. Option includes raising approximately 2,500 ft of existing perimeter containment berms. An additional 30 calendar days will be added to contract duration if awarded. Contractor shall demonstrate experience as a prime contractor dredging Federal navigation channels and the ability to produce upwards of 15,000 CY/day with their pipeline dredge equipment. Contractor should be familiar with working in and around dredge material placement areas due to the soft consistency of the soil and the requirements to maintain the sites during dredging operations. Contractor should demonstrate experience dredging areas with moderate to heavy barge and ship traffic due to the coordination efforts which must take place with the industries along the Intracoastal Waterway.

Details

Division 35 - Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Dredging.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents