Similar Projects
US-23 Over M-36 Bridge Rebuild
New Construction
Conception
$12,000,000 est. value
Howell, MI

Summit Street Water Storage Tank Painting - WS.28 - City of Brighton
Infrastructure
Conception
$775,000 CJ est. value
Brighton, MI 48116

St Joseph Mercy - Brighton Expansion & Renovations / Trinity Health
New Construction, Renovation, Infrastructure - 209,326 SF
Design
$100,000,000 CJ est. value
Brighton, MI 48114

Panda Express / Howell
New Construction, Infrastructure - 2,666 SF
Bidding
$1,000,000 CJ est. value
Hartland Township, MI 48843

Crack Filling - Parking Lots
Post-Bid
Brighton, MI

CDBG ADA Sidewalk and Ramp Installation Project
Infrastructure
Post-Bid
$800,000 CJ est. value
Milford, MI 48381

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

I - 496 Reconstruction - University Region (DB)
Results
Less than $77,000,000 est. value

Howell Storage Marion D19 Expansion and Renovation
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Howell, MI 48843

Main Street Streetscape - City of Brighton
Infrastructure
Conception
$4,573,700 CJ est. value
Brighton, MI 48116

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

Huron Street Reconstruction and Water Main Improvements
Results
Less than $1,050,000 est. value
Milford, MI

Rehabilitation of Pine Creek Lift Stations - City of Brighton
Infrastructure
Conception
$517,000 CJ est. value
Brighton, MI 48116

Hay Creek Bridge Improvements
Renovation
Post-Bid
Hamburg, MI

Old US-23 and Hyne Road Intersection Reconstruction and Paving
Alteration
Results
$725,000 est. value
Howell, MI

Last Updated 10/05/2022 12:03 PM
Project Title

Bridge Reconstruction Including Replacement Concrete Box Beams and Approach Work on Peavy Road

Physical Address View project details and contacts
City, State (County) Hartland Township, MI 48843   (Livingston County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $1,776,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bridge reconstruction including replacement with 17 inch prestressed concrete box beams and approach work on Peavy Road over Marion-Genoa Drain, Livingston County. This is a Local Agency project. Control Sec Job No Federal No BFPO 47000 212306A 22A0850 Net classification required for this project is 1776 Fa 2210 038 - Bridge Reconstruction Including Replacement Concrete Box Beams and Approach Work on Peavy Road 0197-21-0020

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents