Similar Projects
Cranes MATOC
Design
$10,000,000 est. value

Traffic Signal Cable
Post-Bid
Irving, TX 75060

Park Sign Frame Post
Post-Bid
Irving, TX 75060

Fabric Structures with Related Materials and Services
Results

Public Safety Video Surveillance Solutions with Related Equipment, Software and Accessories
Results

Reinforced Concrete Pipe
Term Contract
Post-Bid
Grand Prairie, TX 75050

Vehicle Lifts, with Garage and Fleet Maintenance Equipment
Results

Pearl Crew Room HVAC Replacement Unit
Post-Bid
Dallas, TX 75226

Steel Monopole Structures 345KV T-Line Neville Rd/Greasewood
Post-Bid
Garland, TX 75040

ED Bus Lift Replacement
Post-Bid
Dallas, TX 75226

Valves
Post-Bid
Irving, TX 75060

Water Meters
Term Contract
Post-Bid
Irving, TX 75060

Postive Displacement Water Meters
Term Contract
Post-Bid
Irving, TX 75060

Non-Metallic Pipe, Tube Hose Fittings and Non Powered Valves
Term Contract
Post-Bid
Dallas, TX 75212

Reinforced Concrete Cylinder Pipe Fittings
Post-Bid
Irving, TX 75060

Reported 11/20/2019 12:00 AM
Project Title

Nevill Road - Greasewood Transmission Line Material

Physical Address View project details and contacts
City, State (County) Garland, TX 75040   (Dallas County)
Category(s) Single Trades
Sub-Category(s) Equipment
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Greasewood This project consists of the specifications and drawings for bids for the material associated with the construction of the 345-kV Nevill Road to Greasewood Single Circuit Transmission Line project described below. Prices will be based on the unit prices provided in the attached “Nevill Road to Greasewood Material Bid Sheet.” The overall project consists of building a new single circuit 345-kV transmission line that will run from the proposed Nevill Road Switch to Greasewood Substation. The total line length from Nevill Road to Greasewood is approximately 9.9 miles. All new structures will be galvanized steel monopoles and utilize either a direct embedded or drilled shaft foundation. The new line will be designed to support one (1) three-phase circuit of 795 ACSR “DRAKE” transmission conductor consisting of two (2) wires per phase. Cut Ins This project consists of the specifications and drawings for bids for the material associated with the construction of the 345-kV Bakersfield to N. McCamey (Nevill Road Cut-Ins) Transmission Line project described below. Prices will be based on the unit prices provided in the attached “Bakersfield to N. McCamey Material Bid Sheet” and actual amounts as determined based on calculations. The overall project consists of cutting in the existing Bakersfield – N. McCamey 345-kV transmission line in the new Nevill Road station. All new structures will be monopoles and utilize drilled shaft foundations. The new line will be designed to support one (1), three phase circuit of 1590 ACSR “LAPWING” transmission conductor consisting of one (2) wires per phase.

Details

Division 11 - Equipment.
Division 33 - Utilities, Electrical Utility Transmission and Distribution, Transmission and Distribution Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents