Similar Projects
Natures Edge Business Center Third Addition
Infrastructure
Results
$2,000,000 est. value
Elk River, MN 55330

Clearview Elementary Site Improvements
Infrastructure
Post-Bid
$800,000 est. value
Clear Lake, MN 55319

RAX 2021 Improvements
New Construction
Results
$200,000 est. value

Becker Public Schools - New Transportation Building
New Construction, Infrastructure
Results
$4,020,058 CJ est. value
Becker, MN 55308

Overlays on County Road 34, 53 and 54
Infrastructure
Results
$3,608,562 CJ est. value
Elk River, MN 55330

2023 Surface Improvement Projects
Infrastructure
Post-Bid
$450,000 CJ est. value
Orrock Township, MN 55309

Slim Chickens / St. Cloud
New Construction, Infrastructure - 3,236 SF
Post-Bid
$1,500,000 CJ est. value
Saint Cloud, MN 56304

Becker Public Schools Middle School/High School Additions and Remodeling
Addition, Demolition, Build-out, Infrastructure
Results
$69,925 CJ est. value
Becker, MN 55308

U.S. Highway 10/169 - Anoka County
Infrastructure
Pending Verification
$80,000,000 CJ est. value
Elk River, MN 55330

Becker Public Schools ISD 726 - Field Lighting/Multi Purpose Field Turf
Demolition, Infrastructure
Bidding
$1,250,000 CJ est. value
Becker, MN 55308

2023-2024 Lincoln Elementary School Addition and Renovations
Addition, Demolition, Renovation, Infrastructure
Bidding
$13,000,000 CJ est. value
Elk River, MN 55330

2023-2024 Handke Center Addition and Renovations
Addition, Demolition, Renovation, Infrastructure
Bidding
$10,250,000 CJ est. value
Elk River, MN 55330

Prairie Park 2022 Improvements
Infrastructure
Bidding
$280,000 CJ est. value
Otsego, MN 55330

Median Hightension Cable Barrier Installation - TH 10
Infrastructure
Conception
$2,200,000 CJ est. value
Elk River, MN 55330

Intersection Improvement - TH 25
Infrastructure
Conception
$670,000 CJ est. value
Big Lake, MN 55309

Last Updated 08/27/2022 12:01 AM
Project Title

Improvement Project - Well No. 10

Physical Address View project details and contacts
City, State (County) Otsego, MN 55330   (Sherburne County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer - 08/09/22
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of Well No. 10, Improvement Project No. 22-08 Well #10 Site Mobilization 1 Ls Site Cleanup, Establishment Turf And Controlling Erosion 1 Ls Well #10 Drill & Drive 18" Casing 120 Lf Drill 18" Open Hole 146 Lf Furnish Pea-rock To Backfill 18" Bore 100 Cy Furnish & Install 12" Casing 210 Lf Furnish & Install Grout 10 Cy Remove Pea-rock Fill After Drilling Out Concrete Plug 56 Lf Plumb And Alignment 1 Ls Furnish, Install And Remove Development Equipment 1 Ls Furnish, Install, Detonate Explosives 55 Lbs Well Development 80 Hrs Sandstone Removal By Air Lift Equipment 60 Cy Haul Sandstone Away 60 Cy Discharge Tee On 18" Casing, Valve, Flange Cap 1 Ls Temporary Cap And Well Sanitize 1 Ls Temporary Discharge Piping 10" Dia 120 Lf Furnish, Install And Remove Test Pump Equipment 1 Ls Test Pumping 200 Kw & 150 Hp Pump 30 Hrs Water Analysis Std Menu With Radionuclide 1 Ls Data Logger For Test Pump Recording 1 Ea Video Log 1 Ls Gamma Log 1 Ls Well Report 1 Ls Mdh Permits And Filing Fees 1 Ls

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents