Similar Projects
Hodgdon High School Paving Project
Bidding
Hodgden, ME 04730

Road Paving
Bidding
Saint Agatha, ME

Striping Trucks - Electronic Pavement Marking Systems Maintenance and Repair/Statewide
Post-Bid

Asphalt Street Paving - 2019
Post-Bid
Houlton, ME

(LCP) Light Capital Paving
Results
Less than $1,200,000 est. value
Baldwin, Bridgton, Casco, Fryeburg, Lovell, Naples, Sebago, Sweden, Waterford, ME

(LCP) Light Capital Paving
Results
Less than $840,000 est. value

2020 Paving Project
Bidding
Madawaska, ME

Frenchville Paving 2019
Post-Bid
Frenchville, ME

(LCP) Light Capital Paving
Results
Less than $2,700,000 est. value

Paving Bid
Post-Bid
Mapleton, ME

(LCP) Light Capital Paving
Results
Less than $1,000,000 est. value
ME

Roads Grading Street Sweeping Heating
Post-Bid
Island Falls, ME 04747

Pavement Milling Ultra Thin Bonded Wearing Course Overlay with Drainage and Safety Improvements
Results
Less than $4,340,000 est. value
Caribou, Grand Isle, Van Buren, ME

Patching and Paving at the Caribou High School Campus
Post-Bid
Caribou, ME 04736

Pavement Milling, Hot Mix Asphalt Overlay with Drainage and Safety Improvements
Results
Less than $1,500,000 est. value
Houlton, Littleton, ME

Last Updated 03/07/2019 06:47 AM
Project Title

Crack Sealing

Physical Address View project details and contacts
City, State (County) Fort Fairfield, Fort Kent, Frenchville, Limestone, ME   (Aroostook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Crack Sealing and other incidental work.Location: In Aroostook County, projects are located in Frenchville - St Agatha: Route 162: Beginning at the intersection of US Route 1 and extending southeast 6.26 miles. Fort Kent: US Route 1: Beginning 0.02 ofa mile north of Pine Street and extending north 0.78 ofa mile. Fort Kent: Route 11: Beginning 0.17 mile south of Armory Road and extending north 0.54 mile. Route 11 S: Beginning at Main Street and extending east 0.03 mile. Monument Square: Beginning at US Route 1 and extending east 0.08 mile. Fort Kent: Route 161: Beginning 0.05 mile south of Perley Brook Road and extending north 1.54 miles. Fort Fairfield: US Route IA: Beginning 0.16 of a mile north of Upcountry Road and extending north 4.38 miles to 0.09 of a mile south ofMcShea Siding. Fort Fairfield - Limestone: US Route IA: Beginning at Goodrich Brook Bridge (#5903) in Fort Fairfield and extending north 3.38 miles to 0.02 of a mile north of Bog Road in Limestone.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents