Similar Projects
Buckner Road Townhouses
New Construction, Infrastructure
Conception
$19,600,000 CJ est. value
Thompsons Station, TN 37179

Church Street Infrastructure Improvement - City of Franklin
Infrastructure
Conception
$648,000 CJ est. value
Franklin, TN 37064

Mallory Valley 12 & 24" Mains Contract E
Infrastructure
Design
$1,250,000 CJ est. value
Franklin, TN 37067

West Main Street Commercial Building
New Construction, Infrastructure - 6,500 SF
Design
$2,000,000 CJ est. value
Franklin, TN 37064

Sidewalk Project at Bowie Nature Park Playground
Infrastructure
Bidding
$90,000 CJ est. value
Fairview, TN 37062

HVAC System Replacement and Minor Architectural Renovations for Renaissance High School
Addition, Demolition, Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Franklin, TN 37064

Teriyaki Madness
Build-Out - 1,612 SF
Post-Bid
Brentwood, TN 37013

Grace Christian Academy
New Construction - 82,694 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Franklin, TN 37064

Johnson Elementary Kitchen
Renovation - 800 SF
Results
Franklin, TN 37064

Starbucks #8477
Renovation - 1,438 SF
Construction
Franklin, TN 37064

Dunkin Donuts
New Construction
Pending Verification
Franklin, TN

Aureum Mixed-Use Development
New Construction - 1,700,000 SF
Pending Verification
$10,000,000 CJ est. value
Franklin, TN

Evans Street Sewer Improvements - City of Franklin
Infrastructure
Conception
$452,500 CJ est. value
Franklin, TN 37064

Southwalk Mixed Use - Lot 3
New Construction, Infrastructure - 9,125 SF
Design
$6,000,000 CJ est. value
Nolensville, TN 37135

Water Booster Station Rehabilitation
Renovation, Infrastructure
Bidding
$150,000 CJ est. value
Brentwood, TN 37027

Last Updated 08/30/2022 12:14 PM
Project Title

Wendy's / Brentwood

Physical Address View project details and contacts
City, State (County) Brentwood, TN 37027   (Williamson County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $900,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 30, 2022, an award is still pending.

Details

Food/Beverage Service, 2,608 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents