Similar Projects
Last Updated | 08/17/2021 03:18 PM |
Project Title | 2021 WWTF UV Disinfection Upgrade |
Physical Address | View project details and contacts |
City, State (County) | Allenton, WI (Washington County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Sewage Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work for which bids are asked includes an upgrade to the Allenton Sanitary District Wastewater Treatment Facility (WWTF), but are not limited to, the following: the construction of a new ultraviolet (UV) disinfection system; new stop gates; new weir; disinfection tank contents (liquid and solids) removal and cleaning; modifications to existing disinfection tank; fill in areas of existing disinfection tank for new effluent channel construction; new grating, plating, guardrail and handrails, and miscellaneous metals; removal of existing UV disinfection equipment and associated electrical; new electrical and controls work at both existing Structure 30 (UV Disinfection Tank) and existing Structure 40 (Blower Building); removal of existing stop gates; bypass pumping; turf restoration. |
||||||
Details | Sewage Treatment Plant, Renovation.
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |