Similar Projects
Building Renovations and Sanitary Sewer Upgrades at Seasonal Housing Facility
Renovation, Alteration - 12,000 SF
Design
Nantucket, MA

Contract 13 District H Water Supply Wells and Pump Station
Renovation, Infrastructure - 1,200 SF
Bidding
$2,400,000 est. value
Eastham, MA

Well and Pump Improvements
Infrastructure
Bidding
$170,000 est. value
Weymouth, MA

Sewer Pump Station On-Call Repair & Maintenance
Post-Bid
Less than $67,300 est. value
Burlington, MA

Well Cleaning
Post-Bid
Swansea, MA

Well 2 Redevelopment and Inspection
Results
Less than $30,000 est. value
Needham, MA

Church Lane Gravel Packed Well Redevelopment and Pump Repair
Results
Sagamore, MA

2022 Well Cleaning, Redevelopment and Pump Inspection Project
Infrastructure
Bidding
Webster, MA

Replace One Existing Pump
Post-Bid
$20,000 est. value
Palmer, MA 01069

Redevelopment, Surging and Chemical Treatment of Two (2) Gravel Packed Wells
Results
Wilmington, MA

Route 128 and Nickerson Field Wells Abandonment Project
Infrastructure
Bidding
$100,000 est. value
Weston, MA

Furnish and Install a New Pump Bowl Assembly
Post-Bid
Less than $25,000 est. value
Shrewsbury, MA

Cleaning of Wells 10 and 11
Results
Less than $60,000 est. value
Burlington, MA

Cleaning and Redeveloping of Chestnut Well 3 and Cranberry Well
Post-Bid
Hudson, MA

Replacement Well 5A
Results
Less than $450,000 est. value
Dracut, MA

Last Updated 05/10/2022 02:30 AM
Project Title

Wells 1, 2, and 4R PFAS Treatment Equipment - General

Physical Address View project details and contacts
City, State (County) North Easton, MA   (Bristol County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work under this contract includes, but is not necessarily limited to: furnishing three pairs of pressure vessels for PFAS removal with associated piping, valves, and equipment; furnishing and installing GAC media for each system; and painting, start-up, testing, and training services.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents