Similar Projects
Pleasant Street Subdivision
New Construction
Conception
Brockton, MA 02301

Elliot Street Multi-Residential Development
New Construction, Infrastructure
Conception
$6,000,000 CJ est. value
Brockton, MA 02302

Steam & Condensate IDIQ
Design
Bedford, Hamilton, Hanscom A F B, Humarock, Sagamore, MA - New Boston, NH

Keenes Mill Village
New Construction, Infrastructure
Design
$11,000,000 CJ est. value
Duxbury, MA 02332

Narrows Pump Station Force Main Lining
Infrastructure
Bidding
$240,000 CJ est. value
Wareham, MA 02571

Mental Health Outpatient Renovation Building 5
Term Contract, Renovation, Infrastructure
Bidding
$20,000,000 CJ est. value
Brockton, MA 02301

Richmond Park Water Treatment Plant - Sub Bid
Renovation, Infrastructure
Sub-Bidding
$1,000,000 CJ est. value
Halifax, MA 02338

Remodeling and Minor Renovations for Plymouth County Retirement Association Office
Renovation
Post-Bid
$140,000 est. value
Plymouth, MA 02360

Peddocks Island Welcome Center - General Bid
New Construction
Post-Bid
$265,000 est. value
Hingham, MA 02043

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Results
Less than $95,000,000 est. value

JOC Order Contracting Region A
Results
$10,000,000 est. value

Middleborough Park Department - Basketball Court Re-Paving
Infrastructure
Construction
$150,000 CJ est. value
Middleborough, MA 02346

Main Street Battery Storage Warehouse
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Carver, MA 02330

School Street Mixed-Use Renovation
Renovation, Infrastructure - 24,000 SF
Pending Verification
$5,000,000 CJ est. value
Brockton, MA 02301

Christ Congregational Church
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Brockton, MA 02301

Last Updated 09/28/2022 11:54 AM
Project Title

New Middleborough Department of Public Works (DPW) Facility

Physical Address View project details and contacts
City, State (County) Middleboro, MA 02346   (Plymouth County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected November 2019 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $15,100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for the new Department of Public Works facility on Sachem Street in right on schedule. "Right now, we're in between the design development and construction phases. Everything's progressing," stated Chris Peck, DPW Director, on the status of the new building. The site that will be home to the new DPW Since the town approved the funding and construction at last October's Town Warrant, engineering consultants Weston & Sampson, who also conducted the feasibility study for the project. At the latest DPW Building Committee meeting, held on July 17, representatives from engineering consultants Weston & Sampson, as well as project manager for the site clearing, Daedalus, offered updates on what's been done so far with the land. The intention is to have the preliminary design phase complete for an early/mid-September bidding period. This bidding period will last about six weeks. Peck said the town hopes to attract between 5-10 big capital project contractors for the new DPW. The town hopes to announce a winning bid by mid-October, with construction beginning in late November or early December. According to Peck, preliminary site work, such as establishing the foundation, putting up walls, and ordering steel for the structure, should be workable tasks during reasonable winter conditions. The projected 32,000 square foot new DPW was given a cost estimate of $15.1 million by Weston & Sampson in its feasibility study, though officials are hoping for lower bids. Funds are not being appropriated through a debt exclusion, like the new high school and new police station, but are coming from the town's general funds and enterprise accounts, meaning no tax increases for residents. The 14-18 month construction timetable would put the finished site ready for occupancy by spring 2021. As of August 8, 2019, information regarding an architect is not available. Site clearing has already begun. The intention is to have the preliminary design phase complete for an early/mid-September 2019 bidding period. Closed solicitation has been included below for reference. _______________________________________________________________________________________________________________ Time Period for Completed Project: August 2020 New 32,000 sf DPW facility Designer Fee: Negotiated The method of contractor selection has not been determined at this time

Details

32,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents