Similar Projects
Ready Mix Concrete
Post-Bid
Frisco, TX

Annual Concrete Replacement at Turning Basin Terminal - 2019
Term Contract
Post-Bid
Houston, TX

Concrete Joint Sealing
Results
Frisco, TX

Ready-Mix Concrete and Related Items, Precinct 2
Term Contract
Results
Houston, TX

Y--Building 222 Concrete Work
Post-Bid
Temple, TX 76504

Annual Concrete Street Repair 2018-2019
Term Contract
Results
$194,765 est. value
Heath, TX

Polymer Concrete Cover
Post-Bid
Fort Worth, TX

Full Depth Concrete Repair
Results
Less than $488,786 est. value
TX

Furnish Cement Sand and Stabilized Products
Post-Bid
Houston, TX 77002

Concrete for Transportation
Results
San Marcos, TX

Cement Stabilized Sand
Post-Bid
Texas City, TX 77592

Concrete Crushing/Recycling Services
Results
Bastrop, TX 78602

Construction of Grand Mission Estates Section 22 Sitework, Planting and Irrigation
Post-Bid
TX

Annual Miscellaneous Concrete Work Project (Section A) - Bid 2018
Term Contract
Results
Mesquite, TX

Pressure Grouting & Foundation Repair
Post-Bid
Plano, TX 75023

Reported 02/16/2019 12:00 AM
Project Title

Removal and Replacement of Exterior Concrete Basketball Court at Ron Jackson State School

Physical Address View project details and contacts
City, State (County) Brownwood, TX   (Brown County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFP)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. The work Includes removal and replacement of the entire damaged or broken concrete Basketball court. 2. The existing concrete cout Is in disrepair and needs replacement. Match existing elevations such that smooth transitions from existing to new are installed. Use the basketball goal foundations (4 each) to establish elevations. Install with a center crown that is 6" higher In the center of the court. 3. Provide expansion and control joints where shown on the drawing. Use details as shown on drawings. 4. Provide steel dowels at each construction joint situation to maintain even elevations. 5. Protect new concrete after installation by Installing temporary fence barriers around the work area. 6. The facility operates 24/7 so that coordination of the work is required to keep the facility secure. Schedule concrete Installation one area at a time to keep disruption to a minimum.Consult with owner If it Is practical to do more than one area at a time. Remember that dowels and other construction materials can always be used as weapons by the youth population so that vigilance must be maintained at all times during construction. 7. The work areas shall be left clean and orderly on a daily basis.
Details
Division 03 - Concrete, Cast-in-Place Concrete.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents