Similar Projects
Stephenson-Taylor Water Line Extension
Term Contract
Design
$100,000 to $250,000 est. value
Carnegie, OK 73015

Porter Avenue Waterline Replacement Phase II
Infrastructure
Bidding
Norman, OK

Waterline Replacement
Infrastructure
Bidding
Tulsa, OK

Section A Waterline and Section B Stand Pipe Painting and Rehabilitation
Infrastructure
Post-Bid
Taft, OK

W912bv21r0047-Presolicitation Notice (Sources Sought)- Bureau of Reclamation Waterline Relocation, Tinker AFB
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Oklahoma City, OK 73145

Water Line Replacement
Results
McAlester, OK 74501

100-200 Block East Garriott Road Waterline Relocation
Results
Enid, OK

CDBG Water Line Replacement
Infrastructure
Bidding
Sand Springs, OK 74063

AMI Electric and Water Meter Installation
Infrastructure
Post-Bid
Edmond, OK

4800-5300 Blocks Venture Road Waterline Improvement
Results
$144,490 est. value
Enid, OK

Storm Pipe Replacement, Waterline Relocation, and Roadway Reconstruction
Infrastructure
Bidding
Enid, OK 73701

Waterline Fittings and Valves
Infrastructure
Post-Bid
Lawton, OK

1500-2500 Block of North Cleveland Street Waterline Relocation
Results
Enid, OK 73703

Waterline Relocation
Infrastructure
Bidding
$50,000 to $54,000 est. value
OK

New Splash Pad at the Atoka Sports Complex
New Construction, Infrastructure
Post-Bid
Less than $250,000 est. value
Atoka, OK 74525

Reported 02/02/2022 12:00 AM
Project Title

137th Backflow Repair

Physical Address View project details and contacts
City, State (County) Oklahoma City, OK   (Canadian County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractors are capable of repairing backflow preventer devices across the base. These devices did not pass required annual inspections or were identified as no longer meeting code to be repaired or replaced. As a results of findings from a resent base cross-connection survey, the fire riser in Building 1045 at Will Rogers Air National Guard Base does not contain an approved backflow prevention device to protect potable water supplies. The existing two check valves installed in series in 1995 needs to be replaced with a new double check valve assemble. A Qualified Fire Protection Engineer will need to design and specify the replacement backflow assembly per UFC 3-600-01, para 9-6.6: the installation of a backflow preventer will follow AWWA Manual M 14, furthermore, per UFGS 21 13 13 Wet Pipe Sprinkler Systems, Fire Protection requires it to be a Double-check valve assembly backflow preventer complying with ASSE 1013, ASSE 1015 and AWWA M14. Per AFI32-1066, section 8.3, Backflow Prevention Devices are to be inspected annually. Of the 63 devices inspected on base in September of 2021, 18 Backflow Preventer Devices did not pass. As a result, these failed backflow prevention devices will need repaired or replaced as needed to pass inspection in order to protect installation potable water. Contractors would employ services of a Qualified Fire Protection Engineer (QFPE) to design and specify a replacement backflow prevention assembly for the fire sprinkler riser in Building 1045 per UFC 3-600-01, AWWA Manual M 14, UFGS 21 13 13 Wet Pipe Sprinkler Systems, Fire Protection, ASSE 1013, and ASSE 1015 and repair additional as needed.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans