Similar Projects
Concrete Pipe and Structures
Term Contract, Infrastructure
Post-Bid
Bedford, VA

Culvert Replacement
Infrastructure
Results
$1,377,000 est. value
VA

Salt Pond Liner Installation
Term Contract, Infrastructure
Results

Glade Mountain / Killinger Creek Reclamation
Infrastructure
Results
$110,000 to $180,000 est. value

CM Pipe - Bedford Residency
Term Contract, Infrastructure
Results

Philpott Landslide Construction/Repairs
Post-Bid
$5,000,000 to $10,000,000 est. value

Reinforced Concret Pipe and Ew-1
Infrastructure
Post-Bid
Bedford, VA 24523

Bore and Jack Reed Creek
Infrastructure
Post-Bid
Bedford, VA 24523

Blue Heron Landing Park
Renovation, Demolition, Infrastructure, Alteration
Post-Bid
Less than $775,000 est. value

Aluminum Structural Plate Arch Pipe And Aluminum Structural Plate Headwalls - Fabrication, Delivery, Assembly And Installation Supervision
Infrastructure
Results

Polymer Coated Corrugated Metal Pipe
Infrastructure
Results
Moneta, VA 24121

Aluminum Arch Pipe
Infrastructure
Results

Pipe Rehabilitation - Route 460
Infrastructure
Post-Bid
$400,000 est. value
Bedford, VA 24523

Case Coal, Llc Bond Forfeiture
Alteration
Results
$110,000 to $180,000 est. value
Duffield, VA 24244

Pipe Jack and Bore
Infrastructure
Results
Bedford, VA 24523

Reported 06/17/2022 12:00 AM
Project Title

Riprap Installation for Erosion Mitigation at Smith Mountain Lake State Park

Physical Address View project details and contacts
City, State (County) Huddleston, VA 24104   (Bedford County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all materials, labor, equipment and supervision to install riprap material along the shore of Smith Mountain Lake near the boat dock located within the Park. Riprap will be added to the shoreline to repair existing shoreline stabilization.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents