Similar Projects
Irvins Creek Greenway Project
Infrastructure
Bidding
$2,700,000 to $2,850,000 est. value
Matthews, NC 28105

Construction of the Town Center Parking Lot Improvements
Infrastructure
Bidding
Cornelius, NC

Lower Little Sugar Creek Greenway Polk Historic Site to the Sugar Creek State Line
Post-Bid
Charlotte, NC

Willow Pond Stream Restoration
Post-Bid
Cornelius, NC 28031

Elmwood Cemetery Retaining Walls
Results
$473,000 est. value
Charlotte, NC 28206

Historic Stewart Creek Stream Enhancement Phase II
Results
Charlotte, NC 28202

Old Concord Road Park and Ride Facility Pond and Slope Repairs
Infrastructure
Bidding
$325,000 to $375,000 est. value
Charlotte, NC 28213

Gosnell Drive Culvert Replacement
Post-Bid
Charlotte, NC 28227

Oneida Road Sidewalk and Culvert Replacement
Results
$1,712,000 est. value
Charlotte, NC 28206

Grey Road Sidewalk and Storm Drainage Improvements
Post-Bid
$500,000 est. value
Davidson, NC 28036

Upper Torrence Creek Tributary No. 1 Stream Restoration
Results
Charlotte, NC

Stewart Creek Greenway
Infrastructure
Post-Bid
$2,350,000 to $2,500,000 est. value
Charlotte, NC 28208

Sidewalk Gaps and Ramps FY21
Results
$979,660 est. value
Charlotte, NC 28206

Ballantyne Reimagined - Phase 1B Public Intersections Modifications and Greenway
New Construction
Post-Bid
Charlotte, NC 28277

Pedestrian Safety FY21
Results
Less than $2,340,800 est. value
Charlotte, NC 28206

Last Updated 10/12/2021 09:55 AM
Project Title

Downtown Greenway Phase 2

Physical Address View project details and contacts
City, State (County) Huntersville, NC 28078   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of approximately 1,965-lf of asphalt greenway with pedestrian boardwalk and associated site improvements for Phase 2 of the Downtown Huntersville Greenway. Work shall also include associated demolition/clearing, grading, erosion control, installation of stormwater conveyance measures, installation of pavement and boardwalk, and associated site furnishings.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents