Similar Projects
Heart Lake Improvements - City of Anacortes
Infrastructure
Conception
$700,000 CJ est. value
Anacortes, WA 98221

US 12/SR 8/Grays Harbor County Fish Passage Barriers-Remove Fish Barrier
Infrastructure
Design
$55,055,000 CJ est. value
McCleary, WA 98557

2023 Small Works Roster
Term Contract
Design
Castle Rock, WA 98611

Disposal of Existing Structure at 1045 SE Ireland Street
Demolition, Infrastructure
Sub-Bidding
$200,000 CJ est. value
Oak Harbor, WA 98277

Construct the Douglas to Urban Industrial 230KV Tie
Term Contract
Sub-Bidding
East Wenatchee, WA 98802

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

2442 WLSP Sinkhole Lake Restoration
Infrastructure
Results
$276,650 est. value
Bellevue, WA 98008

Lechtenberg Farm Asbestos Abatement
Alteration
Results
$91,300 to $100,900 est. value
Vancouver, WA 98660

Planting and Associated Services Contract
Term Contract
Sub-Bidding
Wellpinit, WA 99040

Acceptance of Non Hazardous Fill (Pool Bid)
Alteration
Post-Bid
WA

Terminal 1 Red Lion Hotel Demolition
Infrastructure, Alteration
Results
$1,606,000 to $1,775,000 est. value
Vancouver, WA 98660

RFP - North County Community Office Building Commissioning Services
Term Contract
Sub-Bidding
Arlington, WA 98223

Property Abatement, Demolition, Decommissioning, Asbestos Abatement, and Related Civil Construction for Pierce County Parks
Term Contract
Post-Bid
Tacoma, WA 98405

Weatherization - Stick Built 8539
Alteration
Results
Less than $50,000 est. value
Puyallup, WA

Last Updated 12/21/2022 10:32 PM
Project Title

Tucannon River Habitat Restoration, Project Area 26 Phases III/IV Construction & Materials

Physical Address View project details and contacts
City, State (County) Dayton, WA 99328   (Columbia County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $747,451 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

There are currently Five addendums posted. For more information, please contact M.A. Mortenson Co. or Western Washington University. PPROJECT DESCRIPTION: The Columbia Conservation District is seeking formal bids for project installation and materials. Bid request(s) includes installation and materials for the 2023 Tucannon River Habitat Projects PA 26 Phases III/IV. This Salmonid Habitat Restoration Project is located on the Tucannon River, in Columbia County, SE Washington near Marengo. For additional project information email Aneesha Dieu, District Manager at districtmanager@columbiacd.com. Call (509) 382-4273 to schedule an appointment. Project Area (PA) 26 Phase III/IV is located at Tucannon Road ~MP 9, off of Highway 12 The RFB Coordinator will accept questions via email only through 3:00 pm Wednesday, December 7, 2022. Questions will be answered in writing by the RFB Coordinator and provided via email by 5:00 pm Friday, December 9, 2022. This Contract includes work as described below. The description is summarized and may not include specific reference to all incidental work elements required to complete the Contract. Include all labor, materials, equipment, and incidentals required for completion of the Work as shown on the Contract Drawings and specified herein. 1. Mobilization and demobilization 2. Site preparation, including: a) Establishing staging areas and Work access routes as indicated on the Contract Drawings; includes limited clearing and grubbing. b) Contractor to develop and implement elements of an approved Water Quality Management Plan. c) Contractor to develop and implement an approved Traffic Control Plan, where applicable. d) Contractor to develop and implement elements of an approved Care of Water Plan in preparation for excavation required for various elements of the Work. 3. Diversion and control of water during construction in accordance with the approved Care of Water Plan and other construction permit conditions. 4. Installing, maintaining during construction, and removing at construction completion temporary erosion and sediment control measures. 5. Installation of multiple large woody debris (LWD) and engineered log jam (ELJ) structures as shown on the Contract Drawings and as described in the Specifications. 6. Excavation of portions of existing spoils piles as shown on the Contract Drawings and as described in the Specifications.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents