Last Updated 11/06/2019 09:07 AM
Project Title

UT FLAP 70131(1), Strawberry Sheep Creek

Physical Address View project details and contacts
City, State (County) Charleston, UT 84032   (Wasatch County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $15,000,000 to $20,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Strawberry Sheep Creek connector is a 31.9 mile route that connects US-6 to US-40 through the Uinta-Wasatch-Cache National Forest (USFS) in both, Utah and Wasatch Counties, and includes Sheep Creek - Rays Valley Road (FR70051), Unicorn Ridge - Indian Creek Road (FR70042), and West Side Strawberry Road (FR70131). The base Schedule A consists of road widening, reconstruction, asphalt surfacing, drainage, and safety improvements to the unpaved 12.24 miles of Unicorn Ridge-Indian Creek Road (FR70042) between the intersections with Sheep Creek - Rays Valley Road (FR70051) and West Side Strawberry Road (FR70131). Major work elements for Schedule A include widening the roadway to a consistent width and vertical and horizontal alignment changes to correct roadway geometry and improve safety. Construction will generally include cut slopes, embankment, rockery/rock embankment slope treatments, reinforced soil slopes, aggregate base course, and paving. Improvements include clearing roadside vegetation, stabilization of shoulders, drainage improvements, pavement markings, and updating signing. Select pullouts and access road intersections will also be rehabilitated. Significant Quantities of Schedule A: Item Unit Estimated Quantity Clearing and Grubbing ACRE 90 Embankment CUYD 44,500 Reinforcement Geosynthetic SQYD 27,700 RipRap CUYD 540 Rock Embankment CUYD 2,750 Rockery SQFT 8,460 Aggregate Base TON 58,000 Hot-Asphalt Concrete Pavement TON 36,000 Culverts LNFT 3,700 Structural Plate Culvert LNFT 125 Concrete Curb LNFT 5,100 Seeding and Mulching ACRE 50 Option X consists of 7.00 miles of pavement preservation of Sheep Creek - Rays Valley Road (FR70051) from US-6 to the intersection with Unicorn Ridge - Indian Creek Road (FR70042) (start of Schedule A). Construction will generally include ditch reconditioning, patching, crack sealing, and chip sealing the existing pavement surface. Additional improvements include pavement markings and updating signing. Significant Quantities of Option X: Item Unit Estimated Quantity Ditch Reconditioning Mile 6 Subexcavation CUYD 300 Pavement Patching SQYD 4,500 Emulsified Asphalt TON 175 Chip Seal SQYD 101,600 Option Y consists of road rehabilitation of West Side Strawberry Road (FR70131) from the intersection with Unicorn Ridge - Indian Creek Road (FR70042) (end of Schedule A) extending 3.75 miles towards the North. Construction will generally include ditch reconditioning, partial pulverizing and asphalt overlay, and chip seal. Additional improvements include pavement markings and updating signing. Significant Quantities of Option Y: Item Unit Estimated Quantity Subexcavation CUYD 300 Full Depth Reclamation SQYD 28,900 Hot-Asphalt Concrete Pavement TON 5,400 Emulsified Asphalt TON 45 Chip Seal SQYD 52,200 MISCELLANEOUS: Road closures to public traffic are allowed in Schedule A, Unicorn Ridge-Indian Creek Road (FR70042), during a large portion of the construction activities. Access through the closure to USFS permit holders will be required at all times.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents