Similar Projects
Construction of Hames Road Improvements
Infrastructure
Bidding
Woodstock, GA 30189

Construction Services- Bells Ferry Road at Kellogg Creek Road and Victory Drive Improvements
Infrastructure
Bidding
Woodstock, GA 30189

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
Less than $95,000,000 est. value
Camp Lejeune, NC

Southern Region Disaster Recovery Support BPA
Results

Routine Maintenance - D6
Results
Cartersville, Holly Springs, GA 30120

2022 LMIG Asphalt Resurfacing Project
Infrastructure
Bidding
Holly Springs, GA

Main Street Drainage Improvement
Results
Woodstock, GA 30188

2022 Resurfacing Project
Infrastructure
Bidding
GA

T32-D6-PPV-Bartow-Cherokee-114012
Results

Carver Lane and Signal Installation
Infrastructure
Bidding
Lebanon, GA

1.443 Miles of Widening and Reconstruction for Additional Turn Lanes on SR 40 Beginning West of Grove Blvd (CS 481) and Extending East to Truss Plant Rd (PR 718)
Results

Pavement Evaluations for Interstate Maintenance
Alteration
Bidding
$25,000 est. value

LMIG Street Resurfacing
Results
College Park, GA 30337

2022 Resurfacing Project Phase II
Infrastructure
Bidding
Canton, GA

Last Updated 03/23/2022 09:43 AM
Project Title

Arnold Mill Road Streetscapes Improvements

Physical Address View project details and contacts
City, State (County) Woodstock, GA 30189   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done consists of the furnishing of all materials, labor, and equipment for the complete construction of the Arnold Mill Road Streetscape Improvements Project, including, but not limited to, erosion control, maintenance of traffic, paving, grading, excavation, subgrade preparation, drainage construction, wall construction, concrete surface course, sidewalks, pavement marking, grassing, and hardscape/landscape items at locations indicated in the plan set.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents