Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

North System North Trunk (NSNT) Sewer Siphon Replacement
Infrastructure
Design
$2,000,000 CJ est. value
Chino, CA 91710

Starbucks / San Bernardino
New Construction, Infrastructure - 1,001 SF
Bidding
$750,000 CJ est. value
Highland, CA 92346

Construction of Simulation Center
New Construction, Infrastructure - 70,000 SF
Bidding
$100,000,000 CJ est. value
Fort Irwin, CA 92310

O'Reilly Auto Parts #2 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

O'Reilly Auto Parts #2 / Colton
New Construction, Infrastructure - 7,453 SF
Post-Bid
$2,000,000 CJ est. value
Colton, CA 92324

Replace Pcc and Ac Pavement With Jpcp and Hma Pavement
Infrastructure
Results
CA

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Starbucks - East Highland Avenue / San Bernardino
New Construction, Alteration - 928 SF
Pending Verification
$300,000 est. value
San Bernardino, CA 92404

Redlands Mall Development
New Construction, Renovation - 84,106 SF
Design
$275,000,000 est. value
Redlands, CA 92373

Runway 26R ILS Upgrade Project at Ontario Internatonal Airport
Infrastructure
Bidding
$3,250,000 CJ est. value
Ontario, CA 91761

Z1da-- 605-19-410 Upgrade Parking Lot -Lighting and Conduit
Term Contract
Post-Bid
$1,000,000 to $2,000,000 est. value
Loma Linda, CA

Saw Cutting, Asphalt Repair/Replacement, Slurry, and Paving
Infrastructure
Results
Yucaipa, CA 92399

Pumalo Street Townhomes
New Construction, Infrastructure
Design
$4,500,000 est. value
San Bernardino, CA 92404

Storm Drain Improvements
Infrastructure
Post-Bid
Chino, CA 91709

Last Updated 08/25/2022 04:09 PM
Project Title

N. Cherry Avenue at Live Oak Avenue Traffic Signal Modification Project

Physical Address View project details and contacts
City, State (County) Fontana, CA 92337   (San Bernardino County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $876,055 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 22, 2022, the project has been awarded. A timeline for construction has not been confirmed. The general items of work to be done consists of removing an existing traffic signal and its facilities, installing new traffic signal poles, mast arms, emergency vehicle detectors, battery back-up system, control assemblies, pull boxes, pole foundations, conduit undergrounding, access ramp improvements, AC paving, signing and striping, as well as performing video inspection of sewer, installing curb opening catch basins, reinforced concrete pipes, restoring all improvements to preconstruction conditions, and all related work required as indicated on the project plans for the N. Cherry Avenue at Live Oak Avenue Traffic Signal Modification Project. Online Q&A : Yes Q&A Deadline : 05/28/2022 2:00 PM (PDT) Liquidated Damages : $1,500 per Calendar Day Type of Award Lump Sum This project is located at the existing signalized intersection of North Cherry Avenue and Live Oak Avenue in Fontana, CA 92337. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents