Similar Projects
Indefinite Delivery/Indefinite Quantity Electronic Security Systems (ESS) 7th Generation
Term Contract
Design
Less than $675,000,000 est. value

J061--Transformer Inspection and Testing
Post-Bid
Phoenix, AZ 85012

G2 Fl Shack Electric Power Distribution Equipment
Post-Bid
Phoenix, AZ 85034

34.5Kv And 7.2Kv Fuse Mounting Switches for a Kv2d Transformer
Results
Phoenix, AZ

Electrical and Fiber Optic Line Locating Services
Results
Glendale, AZ

21Q5034 VCC Electric Pwr Dist Equip
Post-Bid
Phoenix, AZ 85034

Ocotillo Road Improvements- Greenfield to Higley
Results
Gilbert, AZ 85234

6115--NAVAHCS, PVAHCS, SAVAHCS Emergency Standby Generator Maintenance
Term Contract
Post-Bid
Phoenix, Prescott, Tucson, AZ - Albuquerque, NM 86301

Energy Management Controls Systems (EMCS) Repair Services
Term Contract
Results
Phoenix, AZ

644- UPS Battery Replacement
Term Contract
Post-Bid
Phoenix, AZ 85012

Transformer Leak Repairs and Oil Processing 2021
Results
$100,000 est. value

Hanger Fans
Term Contract
Post-Bid

Generator Maintenance
Term Contract
Results
Tempe, AZ

PIMC Kitchen Hood Service
Term Contract
Post-Bid
Phoenix, AZ

Emergency Backup Generators Citywide
Alteration
Results
$1,500,000 est. value
Buckeye, AZ 85326

Last Updated 08/30/2022 04:05 PM
Project Title

District 7 Convert Solar Parking Lights to Electrical

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85339   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Owner To Subcontract, Bids by Invitation
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Owner's Representative
Owner View project details and contacts
Architect View project details and contacts
Description

The scope includes Demo and remove 10 existing solar lights and pole bases, Install 13 parking light poles/ fixtures and pole bases as shown in Exhibit B and light pole foundation plan Exhibit C. Contractor is responsible to investigate and design a fully functioning site lighting system including load calculations. The responsibility for submitting a response to this IFB to the Contracts Management Department on or before the stated time and date will be solely the responsibility of the respondent. All responses are subject to the conditions, instructions and the specifications attached hereto. This Agreements intent is to represent an all-inclusive 100% cost based on scope, size, quality and nature of the proposed Project. It is the responsibility of the Contractor to evaluate the Project based on a thorough review of all available documents provided by disciplines involved with the development and description of the Project. DEADLINE FOR WRITTEN QUESTIONS: Monday, July 25, 2022 @ 5:00 pm DEADLINE FOR WRITTEN RESPONSES: Friday, July 29, 2022 @ 5:00 pm District Seven Service Center, Tribal Projects Department nor Contracts Management Department will be responsible for distributing to Contractor's any hard or electronic copies of plans or specs. It is up to the Contractor to print them.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents