Similar Projects
PQ List for HVAC Rehabilitation, Repairs and Renovation Services (CD)
Term Contract
Bidding
Pittsburgh, PA 15219

East Headworks - Heating Ventilating and Air Conditioning HVAC
Bidding
Pittsburgh, PA

H--Boiler and Chiller Water Treatment Services Pittsburgh VAMC
Post-Bid
Pittsburgh, PA 15420

Planned Maintenance of Chillers and Other Cooling Equipment - District Wide
Post-Bid
Pittsburgh, PA 15123

Food Service Loading Dock HVAC
Results
$60,000 est. value
Pittsburgh, PA

HVAC Rooftop Unit Replacement at East Liberty Garage and West Mifflin Garage
Results
$1,000,000 est. value
Pittsburgh, PA 15206

Gateway Middle School - Additions & Renovations (HVAC Construction)
Bidding
Monroeville, PA 15146

Heater Units
Post-Bid
Pittsburgh, PA 15219

HVAC Unit Replacement
Results
Homestead, PA 15120

Water Treatment Plant Clarifier Building - HVAC Construction
Bidding
$45,000 est. value
Jefferson, Rices Landing, PA 15357

Cathedral of Learning Ground Floor Renovation - HVAC Construction
Post-Bid
$875,000 to $950,000 est. value
Pittsburgh, PA 15260

Low Pressure Steam Humidification System II
Term Contract
Results
Pittsburgh, PA 15123

Drying Units
Post-Bid
Pittsburgh, PA 15201

Elevator Space Conditioning (HVAC)
Results
Less than $170,000 est. value
Pittsburgh, PA 15212

HVAC Rooftop Replacement - Community & Recreation Center
Post-Bid
Upper Sainte Clair, PA 15241

Last Updated 02/19/2021 08:13 AM
Project Title

Manchester Garage Engine Test Facility - HVAC Construction

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15233   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of this Project includes, but is not limited to, the furnishing of all labor and materials for the installation of the Engine Test Facility at Manchester Garage. General Construction scope includes constructing masonry and steel framed Test Room and Control Room, installing Dynamometer Engine Test Equipment and related engine test equipment, HVAC scope includes building exhaust, engine exhaust, and control room air conditioning. Plumbing scope includes modifications to water supply and drainage systems, fire protection, and compressed air. Electrical scope includes power and lighting modifications necessary to support the new facility.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents