Similar Projects
Cabinet Mountains Water District - Water System Improvements Project - Phase - 2
Renovation, Infrastructure
Bidding
$700,000 CJ est. value
Bonners Ferry, ID 83805

2022, East Ustick Road Trunk Line, Dixie Drain to Florida Avenue
Infrastructure
Results
$1,244,889 CJ est. value
Caldwell, ID 83605

Sewer Line and Drain System Improvements
Infrastructure
Results
$78,000 CJ est. value
Boise, ID 83702

exp - Holt Arena President's Deck Mechanical and Plumbing
Alteration
Post-Bid
$200,000 est. value
Pocatello, ID

Wastewater Treatment Plant Dewatering Project
New Construction, Renovation, Infrastructure
Post-Bid
$9,500,000 CJ est. value
Idaho Falls, ID 83402

High Density Polyethylene Pipe (HDPE) Lining
Term Contract
Post-Bid
Boise, ID 83702

Vault Toilet Pumping Service
Term Contract
Post-Bid
Boise, ID 83702

FY22 Capital Maintenance, Phase 1, Boise
Infrastructure
Post-Bid
$15,000,000 CJ est. value
Boise, ID 83702

NWB Shoshone Outbuildings - 50% CD
Alteration
Post-Bid
Preston, ID

Replace Sink
Alteration
Post-Bid
ID

Last Updated 01/24/2023 09:43 AM
Project Title

Spring Valley Wastewater Treatment Plant Phase 1

Physical Address View project details and contacts
City, State (County) Eagle, ID 83616   (Ada County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $17,087,277 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project generally consists of constructing a screen building, an influent pump station, aerated lagoon cells, weir structures, settling ponds, chlorine mixing structures, manholes, flow metering structures, winter storage ponds, a chemical building, an irrigation pump station, electrical, controls, plumbing, HVAC, sitework, yard piping, and other items of miscellaneous work as shown on the drawings and described in the specifications. The Owner has entered into contracts for the prepurchase of an air gap system, emergency generators, vertical turbine pumps, lift station pumps and controls, lagoon liner system, a grinder pump station, a vertical manhole screen, surface aerators, piping and valves. The Owner will assign these contracts to the selected bidder. The contract value and contract holder for this equipment is listed in the bid schedule. Overall Project Substantial Completion: 420 days Final Completion: 480 days

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents