Similar Projects
Z--Slbe - Empire Water Renovations
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Empire, MI

First Street Water Main Replacement
Alteration
Bidding
$1,270,000 est. value
Rogers City, MI

Reconstruction of Straight Avenue from Wealthy Street to Emperor Street and Wealthy Street From Straight Avenue to 300` West of Front Street
Infrastructure
Bidding
$1,192,955 est. value
Grand Rapids, MI

Water Service/Water Main Repair Parts
Term Contract
Post-Bid
Flint, MI

WWTP Wet Weather Storage Tank
Post-Bid
Whitmore Lake, MI 48189

Water Main Condition Assesment Services Throughout City of Detroit (CS-1909A)
Results
Detroit, MI

Hawthorn Center - Replace Galvanized Piping
Results
Northville, MI 48167

Lead Service Line Replacement
Infrastructure
Bidding
$5,000,000 est. value
MI

Water Maintenance Parts
Term Contract
Post-Bid
Oakland, MI

Water Main Repair Parts
Results
Southfield, MI 48037

Barton Pump Station Valve Improvement Project
Infrastructure
Bidding
Ann Arbor, MI 48103

T4: Infrastructure
Post-Bid
Highland, MI

Hangar 665 Expansion and Watermain Upgrades Project
Addition - 22,000 SF
Results
Less than $10,000,000 est. value
Gwinn, MI

Forcemain Maintenance and ARV Replacement
Alteration
Bidding
$1,050,000 est. value
Ann Arbor, MI

Water System Water Main Improvements
Post-Bid
Temperance, MI

Last Updated 12/27/2021 09:34 AM
Project Title

2021 Domestic Waterline Replacement Project

Physical Address View project details and contacts
City, State (County) Montrose, MI   (Genesee County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace approximately 400’ of 4” domestic water line from the office intersection south to the gym intersection. Remove and replace approximately 100’ west towards exit. Remove and replace approximately 160’ of 4” domestic water line across the boy’s locker room ceiling. Remove and replace approximately 200’ of 4” domestic water line from the mechanical room out into the corridor and west to the intersection by offices. Remove and replace pipe into basement on wing wall from boy’s locker room into the auxiliary gym. Demo the existing galvanized water line and replace with new 4” copper piping. Tie the existing branch piping back into new copper main. Insulate all new piping. Remove asbestos material on replaced piping. Replace wall with new block.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents