Similar Projects
Cameron Park Drive Widening - Palmer Drive to Sudbury - 72143 - El Dorado County
Alteration
Conception
$6,047,000 est. value
Cameron Park, CA 95682

US 50 / Latrobe Road / El Dorado Hills Boulevard Interchange Improvements Phase 2B - 36104001 - El Dorado County
Infrastructure
Conception
$7,620,000 est. value
Placerville, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

RFP Design - Flume 45 Section 3 Replacement
Infrastructure
Design
$11,000,000 CJ est. value
Placerville, CA 95667

2023 Black Bart Waterline Replacement Project
Infrastructure
Bidding
$3,850,000 CJ est. value
South Lake Tahoe, CA 96150

2022 Hangar Taxilane Rehabilitation Project
Infrastructure
Bidding
$550,000 CJ est. value
South Lake Tahoe, CA 96150

Parking Lot Sweep and Steam Placerville DMV
Infrastructure
Post-Bid
$123,984 est. value
Placerville, CA 95667

CHP Camino Platform Scales- Parking Lot Sweeping Services
Infrastructure
Post-Bid
Placerville, CA 95667

Roadway Excavation Place Hot Mix Asphalt and Plastic Pipe
Infrastructure
Results
$870,000 est. value
CA

Hot Mix Asphalt (Hma) Concrete Grinder Dig Out Repair and Replacement Paving
Infrastructure
Results
Placerville, CA

Mackinaw Hotel
New Construction, Infrastructure - 6,000 SF
Pending Verification
$26,000,000 CJ est. value
Placerville, CA 95667

Mackinaw Hotel
New Construction, Infrastructure - 6,000 SF
Pending Verification
$26,000,000 CJ est. value
Placerville, CA 95667

Ice House Road Pavement Rehabilitation - Phase 3 - 36105068 - El Dorado County
Infrastructure
Conception
$2,533,000 est. value
Kyburz, CA 95720

New Construction of Several Buildings at Walt Tyler Elementary School
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Grizzly Flats, CA 95636

Shakori Garage Replacement
Demolition, New Construction, Infrastructure
Bidding
$3,300,000 CJ est. value
Riverton, CA 95726

Last Updated 08/08/2022 12:31 PM
Project Title

Country Club Drive Extension - Silva Valley Parkway to Tong Road - 36105008 - El Dorado County

Physical Address View project details and contacts
City, State (County) Cameron Park, CA 95682   (El Dorado County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2025
Bids Due View project details and contacts
Estimated Value $6,941,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct new two-lane road from Silva Valley Parkway to Tong Road. TIF Includes curb, gutter and sidewalk for a portion of the road segment. Project is included in the El Dorado County’s FY 2022-2042 Budget CIP. As of August 8, 2022, information regarding a design team or a general contractor is not available. Construction is anticipated from FY 2025 to FY 2027.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents