Similar Projects
Classroom and Storage Facility at Firehouse #2 - City of Alabaster
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Alabaster, AL 35007

LED Lighting at Veterans Park - City of Alabaster
Infrastructure
Conception
$600,000 CJ est. value
Alabaster, AL 35007

Montevallo Water Treatment Plant - Residential and Commercial Water Meters
Infrastructure
Design
$9,500,000 CJ est. value
Montevallo, AL 35115

District 31 Shopping Center - Phase 1 & 2
New Construction, Infrastructure - 350,000 SF
Design
$75,000,000 CJ est. value
Alabaster, AL 35007

Pelham Police and Court Building Additional Parking
New Construction, Infrastructure
Bidding
$200,000 CJ est. value
Indian Springs Village, AL 35124

Main Street Phase One Project
Infrastructure
Bidding
$400,000 CJ est. value
Calera, AL 35040

American Village Independence Hall & Congress Hall Project
New Construction, Infrastructure
Post-Bid
$1,000,000 CJ est. value
Montevallo, AL 35115

Oak Mountain Trail Mass Grading
Infrastructure
Post-Bid
Pelham, AL

Appleford Sidewalk Repairs
Infrastructure
Results
$50,390 CJ est. value
Helena, AL 35080

Roadway and Utility Improvements Chelsea ABC Site
Infrastructure
Results
$573,230 CJ est. value
Chelsea, AL 35043

Ascension St. Vincent's McCain Parkway Hospital
New Construction, Infrastructure - 40,000 SF
Pending Verification
$35,000,000 CJ est. value
Pelham, AL 35124

Blackridge South Phase 1
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hoover, AL 35080

Alabaster Boulevard Improvements & Connector Road Construction - City of Alabaster
Infrastructure
Conception
$300,000 CJ est. value
Alabaster, AL 35007

$PRESS - Police Station - Williams Blackstock Architects
New Construction, Infrastructure - 35,000 SF
Design
$12,000,000 CJ est. value
Alabaster, AL 35007

Fire House 1 Parking Pad
Infrastructure
Bidding
$82,000 CJ est. value
Alabaster, AL 35007

Last Updated 10/19/2022 09:56 AM
Project Title

Stratford Lift Station Pump Replacement

Physical Address View project details and contacts
City, State (County) Pelham, AL 35124   (Shelby County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Each BID must be submitted in a sealed envelope, addressed to the City of Pelham, Alabama at the Water Works of the City of Pelham, Alabama. Each sealed envelope containing a BID must be plainly marked on the outside as BID for Stratford Lift Station Pump Replacement and the envelope should bear on the outside the name of the BIDDER, his address, his license number if applicable and the name of the Project for which the BID is submitted. All BIDS must be made on the required BID form with the entire bound documents intact. All blank spaces for BID prices must be filled in, in ink, or typewritten, and the BID form must be fully completed and executed when submitted. Only one copy of the BID form is required. A copy of the BIDDER'S State Contractor's License for the state in which the work will be performed must be attached to the BID DOCUMENTS. The OWNER may waive any informalities or minor defects or reject any or all BIDS. Any BID may be withdrawn prior to the above scheduled time for the opening of BIDS or authorized postponement thereof. Any BID received after the time and date specified shall not be considered. No BIDDER may withdraw a BID within 60 days after the actual date of the opening thereof or after the Notice of Award is transmitted to the BIDDER, provided the Award is made within the 60 days herein described. Should there be reasons why the Contract cannot be awarded within the specified period, the time may be extended by mutual agreement between the OWNER and the BIDDER. BIDDERS must satisfy themselves of the accuracy of the estimated quantities in the BID Schedule by examination of the site and a review of the Drawings and Specifications including ADDENDA. After BIDS have been submitted, the BIDDER shall not assert that there was a misunderstanding concerning the quantities of WORK or of the nature of the WORK to be done. The OWNER shall provide to BIDDERS prior to BIDDING, all information which is pertinent to, and delineates and describes, the land owned, and rights-of-way acquired or to be acquired. The CONTRACT DOCUMENTS contain the provisions required for the construction of the PROJECT. Information obtained from an officer, agent, or employee of the OWNER or any other person shall not affect the risks or obligations assumed by the CONTRACTOR or relieve him from fulfilling any of the conditions of the Contract. Each BID must be accompanied by a BID BOND payable to the OWNER in the amount described in the General Specifications. As soon as the BID prices have been compared, the OWNER will return the BONDS of all except the three lowest responsible BIDDERS

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents