Similar Projects
Fort Sanders to Tyson Park Connection - City of Knoxville
Infrastructure, Alteration
Conception
$5,915,000 est. value
Knoxville, TN 37916

Hardin Valley Academy 32 Classroom Addition - Knox County
Addition, Demolition, Infrastructure
Conception
$10,972,000 CJ est. value
Knoxville, TN 37932

Kingston Pike Village - Phase 2
New Construction, Infrastructure
Design
$89,000,000 CJ est. value
Farragut, TN 37934

The Rowan Apartments
New Construction, Infrastructure
Design
$64,000,000 CJ est. value
Knoxville, TN 37923

Carter School Sidewalk Improvements - Knox County
Infrastructure
Bidding
$500,000 CJ est. value
Knoxville, TN 37924

Rural Development Water Line Replacement
Infrastructure
Bidding
$2,574,185 CJ est. value
Knoxville, TN 37902

Construction of Water System Improvements for Cruze Road, Stamps Lane, and Broad Acres Subdivision Phase II
Infrastructure
Post-Bid
$490,000 CJ est. value
Knoxville, TN 37902

Traffic Signal System
Infrastructure
Post-Bid
$594,000 CJ est. value
Farragut, TN 37934

Construction of the Edmondson Lane Booster Pump Station
New Construction, Infrastructure
Results
$367,283 CJ est. value
Knoxville, TN 37918

Boathouse Bridge and Ramp Removal
Demolition, Infrastructure
Results
$375,000 CJ est. value
Knoxville, TN 37902

Lone Tree Pass
New Construction, Infrastructure
Construction
$20,000,000 CJ est. value
Knoxville, TN 37902

Dutch Bros / Knoxville
New Construction, Infrastructure - 950 SF
Construction
$300,000 CJ est. value
Knoxville, TN 37918

First Baptist Concord Church Educational Building
Addition, Demolition, Infrastructure - 27,900 SF
Pending Verification
$8,000,000 CJ est. value
Farragut, TN 37934

Post Oak Bend
New Construction, Infrastructure
Pending Verification
$250,000,000 CJ est. value
Knoxville, TN 37922

Northwest Elementary School Construction - Knox County
New Construction, Infrastructure
Conception
$8,950,000 CJ est. value
Knoxville, TN 37902

Last Updated 10/04/2023 12:25 PM
Project Title

Replacement Jet Aeration Equipment and Pumps For Sequencing Batch Reactor at Eastbridge WWTP

Physical Address View project details and contacts
City, State (County) Knoxville, TN 37902   (Knox County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status All Submissions Received, Results Expected, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Knoxville Utilities Board (KUB) is seeking proposals from manufacturers, companies, and distributors for replacement of jet aeration equipment and jet motive (pumps) for three sequencing batch reactors (SBR) at the East bridge Wastewater Treatment Plant. The successful supplier will provide proposals that meet the attached design criteria. Notice of Award on or around October 2, 2023 Q & A deadline: Sep 22, 2023 7:00:00 AM EDT Issue addendum if required September 18, 2023 Contract duration: One Time Purchase Contract renewal 2 annual renewals. Notice to Proceed on or before October 6, 2023

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents