Similar Projects
High Tension Component Bundle
Term Contract
Sub-Bidding
$100,000,000 CJ est. value
New York, NY 11354

Preventive Maintenance and Water Treatment Service
Term Contract
Sub-Bidding
New York, NY 11427

Portable Toilets in the NYC Region
Term Contract
Post-Bid
Brooklyn, New York, NY 10031

Soil Disposal for Four LNA Sites
Alteration
Post-Bid

S201--Window Cleaning at Manhattan, Brooklyn, St. Albans and Bronx Campuses
Term Contract
Results
Bronx, Brooklyn, Manhattan, Saint Albans, NY

Portable Toilet Services
Term Contract
Results

Rail 136RE High Strength 44ft
Term Contract
Sub-Bidding
New York, NY 11423

Purchase of Refurbished Dispensers & Associated Parts for LNA Service Stations
Alteration
Post-Bid

Sludge Removal from Port Jervis Water Resource Recovery Facility (WRRF)
Term Contract
Results
New York, NY 11354

Seny Medium Voltage Breakers and Electrical Equipment Maintenance Services
Term Contract
Sub-Bidding
New York, NY 11105

Fire Suppression System Testing & Maintenance
Alteration
Post-Bid

Switches 1175 A/B and 1195 N/o Forest Hills / 71st Ave Station, Queens Line, Ind
Term Contract
Results
$732,160 CJ est. value
New York, NY 11366

Contract for Repair, Parts and Labor of Vermeer Equipment
Term Contract
Sub-Bidding
New York, NY 11412

Pest Control Services
Term Contract
Post-Bid
Queens, NY 11101

Purchase of Railroad Wood Crossties and Timbers
Term Contract
Sub-Bidding
New York, NY 11377

Last Updated 03/31/2023 02:19 PM
Project Title

Retrofit Prefabricated Facade

Physical Address View project details and contacts
City, State (County) New York, NY 11101   (Queens County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The New York City School Construction Authority (SCA) is seeking qualified bidders to fabricate and install high performing retrofit facade panels at various existing school buildings. Interested fabricator and installer shall provide all labor, materials, equipment, and expertise, as required, to effectively perform delegated design services including but not limited to, panel design and engineering, detailed shop drawings, testing, fabrication, and installation of panelized wall system to meet the following performance requirements: - Panels shall provide a wall enclosure effective R-Value of 30 with an integral air barrier that will be part of a continuous barrier system enclosing the entire building envelope. - Thermal breaks shall be avoided in panel construction and anchorage. - Facade wall panels shall be supported on the existing building structure with anchorage designed by the fabricator. - Wall panels shall be clad in materials to replicate the appearance of the existing facade and follow NY State Historic Preservation Office guidelines. - Panels may include aluminum, thin brick, glass fiber reinforced concrete, and/or natural stone and shall be provided and installed by a single fabricator / installer regardless of the exterior finish. - Panels shall incorporate high performance projecting windows meeting U-Value of 0.25 and achieving AW-80 and 12PSF water performance (entire panel) or better. - Panels may be built and delivered to sites in large sections. However, final panel sizes may vary to suit site conditions. Panels may span between columns up to approximately 37' by 14'apart; and - Wall panels shall comply with applicable Building Codes, including NFPA 285 or contain no combustible materials. - Typically the building(s) will remain occupied during construction Please include the following in your response: a description of the system you are proposing, examples of similar projects using the proposed system, and why you feel the approach is suited to successfully achieve the objectives noted above. All questions regarding this RFEI shall be emailed to the below contact no later than five (5) business days before the due date. The SCA shall not be held liable for any pre-award activity or costs incurred by your firm for preparation and delivery of its response, producing materials, or attending meetings or any labor, in connection therewith. Responses received will not impact potential future bidding opportunities. Upon review of submitted proposals, firms may be invited to provide an oral presentation of their system and qualifications. All interested and proposing fabricator/installers must be pre-qualified by the SCA at the time of bid opening. Please see the SCA's website (nycsca.org) for further information about the pre-qualification process.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents