Similar Projects
The Sand Trace Phases 1, 2 and 3
New Construction, Infrastructure
Conception
$113,200,000 CJ est. value
Smithfield, RI 02917

The Sand Trace Phases 1, 2 and 3
New Construction, Infrastructure
Conception
$113,200,000 CJ est. value
Smithfield, RI 02917

Hidden Meadows
New Construction
Design
Cumberland, RI

Kennedy Plaza Redesign
New Construction
Design
$140,000,000 est. value
Providence, RI 02903

Furnishings for Ridge Street Playground
Infrastructure
Bidding
$300,000 CJ est. value
Providence, RI 02909

Design Build - Operate Maintain for Kennedy Plaza Food Pavilion
Renovation
Bidding
$8,200,000 est. value
Providence, RI 02903

Design/Build Services for Route 146 Reconstruction
Post-Bid
Providence, RI 02912

Bernon Mill
New Construction
Post-Bid
$22,000,000 to $25,000,000 est. value
Woonsocket, RI 02895

2021 Paver Placed Elastomeric Surface Treatment C-1
Results

Reconstruction of Hebert Avenue
Results
Woonsocket, RI 02895

Central Falls Landing
New Construction, Renovation - 6,297 SF
Construction
$200,000 est. value
Central Falls, RI 02863

Douglas Pike Development
New Construction - 13,000 SF
Construction
$400,000 est. value
Smithfield, RI 02896

The Preserve at Pippin Orchard
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Cranston, RI 02921

Motor Vehicle Repair And Service Addition
Addition - 3,300 SF
Pending Verification
Cranston, RI

Dorrance Street Mixed - Use
Renovation
Conception
$77,000,000 est. value
Providence, RI 02903

Last Updated 09/02/2022 02:01 PM
Project Title

Mineral Spring / Mixed Use Development / North Providence

Physical Address View project details and contacts
City, State (County) North Providence, RI 02904   (Providence County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Gas Station, Paving/Reconstruction, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status Design Development, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: site work, paving and new construction of a service station / car wash facility and a restaurant. As of September 2 2022, a general contractor has been selected. A firm construction timeline for this project. has not yet been released.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Panel Doors, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents