Similar Projects
Freese Center
New Construction - 75,888 SF
Conception
$9,500,000 est. value
Galion, OH 44833

Former U.S. Playing Card Site Redevelopment
New Construction, Demolition
Design
$100,000,000 est. value
Norwood, OH 45212

Tri-City Park Tennis Courts 5 and 6 Improvement
Infrastructure
Bidding
$155,000 est. value
Rocky River, OH

John Hay Gymnasium Floor and Bleacher Replacement
Renovation, Alteration
Bidding
Cleveland, OH 44106

Jim Nichols Tennis Court and Infield Skin Resurfacing at Kettering Field
Post-Bid
Dayton, OH

Post Event Park Restoration Bid
Post-Bid
Columbus, OH

2019 Cincinnati Park Board Facilities/Infrastructure/Capital Improvements
Results
Cincinnati, OH

Harmony Park at the Village of Woodlawn
Results
Woodlawn, OH 45215

PNC Tower - Lower Level Redevelopment
New Construction, Renovation - 35,727 SF
Construction
$6,000,000 est. value
Columbus, OH 43215

Flats Platform Tennis Facility
New Construction - 13,025 SF
Construction
$600,000 est. value
Cleveland, OH 44113

Installing the Silver Creek Metro Park Cross Country Coarse Area Centennial Grove Project
Infrastructure
Bidding
Norton, OH 44203

FY2020 Morrow Phegley Park CDBG Project
Post-Bid
Less than $158,521 est. value
Lebanon, OH 45036

Liberty Park Improvements
Results
$83,500 est. value
Pataskala, OH

2021 Weltmer Park Project
New Construction
Bidding
Perrysville, OH

Renovation of Their John Folcik Park (Beech Street Park) Tennis Courts to Pickleball Courts
Post-Bid
Rossford, OH 43460

Last Updated 07/19/2021 10:25 AM
Project Title

Wolfe Park Bollards

Physical Address View project details and contacts
City, State (County) Columbus, OH   (Delaware County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install all bollards, cable, and sleeves per provided installation guidelines/specifications. Provide labor/equipment, concrete, 3/8” galvanized cable, yellow PVC pipe and all hardware needed to complete this installation. Note 3/8” cable clamps will be needed at the two ends of each four bollard set, two clamps at each end. Work with CRPD project manager to avoid scheduling conflicts with park activities. Return park to pre-installation condition. This would include: removing excess soil, grading, seeding, cleaning hard surfaces, and repairing all asphalt that was damaged. Repaired asphalt will be sealed at all connection points where old and new asphalt meet if necessary. No trees will be impacted as a result of this project. The CRPD tree protection layout plan is one of the enclosures included for this project. It will be followed for any trees that fall within 30’ of the bollard and cable installation location. The protection measures will need to be adjusted where the canopy of the tree overlaps the bollard and cable installation plan and where asphalt lays under the dripline of the tree.

Details

Park/Playground, Renovation.
Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents