Similar Projects
Well No. 5 Pump House and Site Improvements
Infrastructure
Bidding
Lake Hallie, WI

Wellhouse 3 Treatment Equipment
Infrastructure
Bidding
Omro, WI 54963

Sump System Installation
Post-Bid
Two Rivers, WI 54241

2020 Waste Activated Sludge Pump
Post-Bid
Madison, WI 53713

Rehabilitation of Wells 15 and 17 at City Well Field
Results
Eau Claire, WI 54701

2020 Rotary Lobe Pumping Unit Purchases
Results
Madison, WI 53713

Well Drilling Services
Bidding
Merrimac, WI

Well 18 Treatment
Post-Bid
Less than $160,000 est. value
Madison, WI 53713

Municipal Well 4 - Well Construction
Results
Wausaukee, WI 54177

Well Rehabilitation and System Cleaning
Infrastructure
Bidding
$110,000 est. value
Eagle, WI 53119

Well Station No. 5 HMO Treatment Facility & Building Modifications
Post-Bid
$2,907,000 est. value
Pewaukee, WI 53072

2020 Bypass Pump Rehabilitation
Results
Milwaukee, WI

Drilling Observation Services
Renovation, Term Contract
Post-Bid
Oconomowoc, WI 53066

Sun Prairie Utilities Test Well for Well 10
Results
Sun Prairie, WI

Well 10 Maintenance and Rehabilitation
Infrastructure
Post-Bid
Burlington, WI 53105

Last Updated 10/08/2021 03:28 PM
Project Title

Return Activated Sludge Valve Replacements at the South Shore Water Reclamation Facility

Physical Address View project details and contacts
City, State (County) Milwaukee, Oak Creek, WI 53154   (Milwaukee County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of replacing the 20-inch Check Valve in Building 331. The existing upstream RAS/WAS Transfer Pump and downstream 20-inch knife gate valve will provide sufficient isolation for this valve replacement. In addition, the Contract shall furnish a 12-inch knife gate valve, a 20-inch knife gate valve, a 20-inch x 12-inch reducing elbow, and complete the removal and reinstallation of a 20-inch side outlet elbow for four installations of Return Activated Sludge (RAS) piping from the secondary clarifiers to the RAS/WAS Transfer Pumps in Building 332. These existing knife gate valves do not seal / hold, which will necessitate taking Secondary Clarifiers, the Sludge Well and the RAS/WAS Transfer Pumps out of service for their replacement. All work is located within Structures 331and 332 at the South Shore Water Reclamation Facility (SSWRF).

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents