Similar Projects
Lower Little Sugar Creek Greenway Polk Historic Site to the Sugar Creek State Line
Post-Bid
Charlotte, NC

Willow Pond Stream Restoration
Post-Bid
Cornelius, NC 28031

Historic Stewart Creek Stream Enhancement Phase II
Results
Charlotte, NC 28202

Collective Storm Drainage Improvement Projects Series G
Results
Less than $1,732,208 est. value
Charlotte, NC

Gosnell Drive Culvert Replacement
Post-Bid
Charlotte, NC 28227

Hinsdale-Tinkerbell Storm Drainage Improvement Project
Results
Less than $8,784,000 est. value
Charlotte, NC 28202

North Davidson Street 2401 Storm Drainage Improvement Project
Infrastructure
Post-Bid
$1,755,283 est. value
Charlotte, NC 28205

West Branch Rocky River Tributary Rehabilitation
Results
Charlotte, NC

North End Around Taxiway (N.E.A.T.) Package 1- Charlotte Douglas International Airport
Infrastructure
Post-Bid
Charlotte, NC

Grey Road Sidewalk and Storm Drainage Improvements
Results
$500,000 est. value
Davidson, NC 28036

City View Mcalpine Stream Project
Results
$817,433 est. value
Charlotte, NC

1528 Hertford Road Storm Drainage Improvement Project
Results
$1,030,916 est. value
Charlotte, NC 28207

Polypropylene Pipe
Results

3739 Severn Avenue Storm Drainage Improvement Project
Results
$650,090 est. value
Charlotte, NC 28210

Cutchin Drive Storm Drainage Improvement
Infrastructure
Results
$6,525,137 est. value
Charlotte, NC 28210

Reported 03/02/2022 12:00 AM
Project Title

North Mecklenburg Recycle Center BMP Maintenance Project

Physical Address View project details and contacts
City, State (County) Huntersville, NC 28078   (Mecklenburg County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor will be responsible for maintenance-modification to all three rain garden basins. This will involve forebay/drainage improvements and removal of vegetated surface (approximately 0.5 feet +/-) from the basins surface only. Not including access, no disturbance to the surrounding slopes or berms will be required. All excavated material will be hauled off site to a designated location at Soil Supply of Huntersville. In addition, concrete forebays and associated outlet drains will be cleaned, inspected, and upfitted with slurry pumps to be purchased and installed by the contractor. Note: Existing power and plumbing is already installed. New GFI outlets will be installed by contractor. Basin replacement materials will be installed as follows: Basin 1A will receive C-330 Stalite mix and Basins 1B and 2 will receive C-133 sand. Both may be locally sourced and delivered by supplier.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents