Similar Projects
DFCM Construction-Pre-Qualified General-UTNG CW Bldg. 3220 Upgrade
Renovation
Bidding
$1,086,000 est. value
Bluffdale, UT 84065

Soldier Performance Readiness Center (SPRC), Multiple Locations Nationwide
- 41,700 SF
Post-Bid

Soldier Performance Readiness Center (SPRC), Multiple Locations Nationwide
- 41,700 SF
Post-Bid

Utah National Guard Draper Indoor Firing Range TI
Results
Less than $2,064,704 est. value
Draper, UT

Multi-purpose Live Training Structure for Hill AFB
Results
$1,000,000 to $5,000,000 est. value
Hill AFB, UT 84056

UTTR CMCC at Hill AFB, UT
Post-Bid
$25,000,000 to $100,000,000 est. value
Clearfield, UT

Navy OPS Support Center
Results
$10,000,000 to $25,000,000 est. value
Hill AFB, UT

USACE Spk General Maintenance, Repair, and Construction DB and DBB, MATOC, IDIQ for Hill AFB / Tooele Army Depot / Dugway Proving Grounds / Salt Lake City, Utah
Post-Bid
$500,000 to $248,000,000 est. value
Salt Lake City, UT

DFCM Construction-VBS Construction-UTNG Nephi Readiness Center
New Construction - 54,300 SF
Results
$16,100,000 est. value
Salt Lake City, UT

Y--Pariette Field Station Replacement
New Construction
Post-Bid
Vernal, UT

Design Bid Build Composite Aircraft Antenna Calibration Facility
New Construction - 32,000 SF
Post-Bid
$10,000,000 to $25,000,000 est. value
Hill AFB, UT

GSA R8 Utah Full Facility Maintenance Services
Term Contract
Post-Bid

Reported 09/30/2021 12:00 AM
Project Title

DBB Ddhu Lot 4 Hill Air Force Base, UT

Physical Address View project details and contacts
City, State (County) Hill AFB, UT   (Davis County)
Category(s) Government/Public
Sub-Category(s) Military Facility
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Lot 4 project includes placement of a combination of concrete and asphalt pavement on a 16-acre lot, installation of lighted perimeter fence with two powered vehicles gates, two manual vehicle gates and a pedestrian gate. Improvements also include 5 POV parking stalls, construction of a new loading ramp and dock and construction of a new 434 square foot administration building. The work also includes the installation of new storm water, water supply, sanitary sewer and electric power systems to support the new site facilities and incidental related work.

Details

Military Facility, New Construction.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents