Similar Projects
Lynda and Stewart Resnick Center for Agricultural Innovation - University of California - Davis
LEED Certification, New Construction, Infrastructure - 40,000 SF
Conception
$50,000,000 CJ est. value
Davis, CA 95616

Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Construction Contract (MACC) for Renovation, Repair, and New Construction, of Medical Facility Construction at Various Government Installations
New Construction, Renovation
Design
$15,000,000 to $1,000,000,000 est. value

River II
New Construction, Infrastructure - 1,500 SF
Design
$50,000,000 CJ est. value
West Sacramento, CA 95605

Santa Anita Condensate Line and Pan Repair Project
Infrastructure
Bidding
$500,000 CJ est. value
Woodland, CA 95776

Sycamore Trail Ph 2 Extension
New Construction, Infrastructure
Bidding
$8,430,000 CJ est. value
West Sacramento, CA 95691

California Conservation Corps (CCC) Auberry Residential Center - CA Department of General Services
Addition, Demolition, New Construction, Build-out, Infrastructure
Post-Bid
$52,000,000 CJ est. value
Auberry, CA 93602

Construction of Waste Management Unit G Leachate Pond Improvements
Infrastructure
Post-Bid
$4,916,000 CJ est. value
Zamora, CA 95698

2021 Street Light Capital Work Project
Infrastructure
Results
$295,000 est. value
Davis, CA 95616

Hot Mix Asphalt (HMA) Concrete Grinder Dig Out Repair and Replacement Paving in Yolo County
Infrastructure
Results
$300,338 CJ est. value
Zamora, CA 95698

Capay Valley Health and Community Center
New Construction - 28,000 SF
Construction
$15,000,000 est. value
Esparto, CA 95627

Plaza 2555
New Construction, Infrastructure
Construction
$75,000,000 CJ est. value
Davis, CA 95618

Dutch Bros Coffee - Ikea Court / West Sacramento
New Construction, Infrastructure - 950 SF
Pending Verification
$287,000 CJ est. value
West Sacramento, CA 95605

Home2Suites by Hilton Development / Woodland
Demolition, New Construction, Infrastructure - 68,000 SF
Pending Verification
$25,000,000 CJ est. value
Woodland, CA 95695

Sacramento Avenue Mixed Use Development
New Construction, Infrastructure
Design
$168,000,000 CJ est. value
West Sacramento, CA 95605

CRCP, HMA (Type A), Rdwy Exc, Class 2 AB, Fiber Optic Cable Systems
Infrastructure
Bidding
$220,000,000 CJ est. value
West Sacramento, CA 95691

Last Updated 11/15/2022 05:04 PM
Project Title

RFQ D/B - Hospital Bed Replacement Tower - Expansion Control - Bid Package 12

Physical Address View project details and contacts
City, State (County) Davis, CA 95616   (Yolo County)
Category(s) Heavy and Highway, Medical
Sub-Category(s) Hospital, Site Development
Contracting Method Competitive Bids
Project Status Sub-Bidding, Request for Qualifications, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $2,000,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Construction includes the building of a Replacement Hospital Tower (RHT). The RHT is a key piece of UC Davis Healths strategy to achieve seismic safety compliance, additional service capacity, and operational improvements. The RHT project is envisioned to comprise a minimum of +/-332 inpatient beds including ICU and medical/surgical, Acuity Adaptable (ICU capable rooms), complex procedure rooms, and imaging and support services. The building option under consideration is approximately 909,000 BGSF of new space. The proposed site is located on the east end of the existing hospital, adjacent to the Pavilion that houses primarily surgery, ICUs, the burn unit, and the emergency department. The RHT will be connected to the Pavilion. Utilities for the RHT will be supplied from the Central Utilities Plant. Work in this bid package includes; investigation, design-assist, preconstruction and construction for Expansion Control scope for the RHT Project. All work included in this bid package will be performed under the authority and jurisdiction of HCAi. McCarthy Building Companies, Inc. (MBC) has included qualifications for a qualifications-based competitive selection process for Design-Assist Trade Partner services relating to the Hospital Bed Replacement Tower Project (referred to in this RFP as RHT). This Request for Qualifications/Proposals (RFQP) establishes the requirements for Proposal Submission by qualified Proposers. Proposals will be accepted only from qualified Proposers. Proposal Security in the amount of 15% of the Lump Sum Base Proposal, excluding alternates, shall accompany each bid. The surety issuing the Bid Bond shall be, on the bid deadline, an admitted surety insurer (as defined in the California Code of Civil Procedure Section 995.120) All insurance policies required to be obtained by Design-Assist trade partner shall be subject to approval by McCarthy Building Companies and University for form and substance. All such policies shall be issued by a company rated by Best as A- or better with a financial classification of VIII or better or have equivalent rating by Standard and Poors or Moodys. The successful proposer will be required to have the following California contractor's license at the time of the proposal opening: C-61/D24 Metal Products Every effort will be made to ensure that all persons have equal access to contracts and other business opportunities with the University within the limits imposed by law or University policy. Each Bidder may be required to show evidence of its equal employment opportunity policy. The successful Bidder and its subcontractors will be required to follow the nondiscrimination requirements set forth in the Bidding Documents and to pay prevailing wages at the location of the work. The work described in the contract is a public work subject to section 1771 of the California Labor Code. California Wage Determination (2022-2) Date: October 26, 2022 No contractor or subcontractor, regardless of tier, may be listed on a Bid for, or engage in the performance of, any portion of this project, unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 and 1771.1. This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations. The successful proposer shall pay all persons providing construction services and/or any labor on site, including any University location, no less than the UC Fair Wage (defined as $15 per hour as of 10/01/2017) and shall comply with all applicable federal, state, and local working condition requirements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Support Assemblies, Healthcare Metal Supports.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Painting.
Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments, Partitions, Service Walls, Patient Bed Service Walls, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Protective Covers.
Division 11 - Equipment, Mercantile and Service Equipment, Vending Equipment, Foodservice Equipment, Ice Machines, Cleaning and Disposal Equipment, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Operating Room Equipment, Solid Waste Handling Equipment.
Division 12 - Furnishings, Window Blinds, Casework, Furniture, Seating, Institutional Furniture, Healthcare Furniture.
Division 13 - Special Construction, Radiation Protection.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Gas and Vacuum Systems for Laboratory and Healthcare Facilities, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Substations, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems, Healthcare Intercommunications and Program Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Surveillance, Fire Detection and Alarm, Radiation Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents