Similar Projects
I-5: Exit 125 Northbound at Garden Valley Blvd
Infrastructure
Design
$2,500,000 CJ est. value
Roseburg, OR 97470

I-5: Exit 125 Northbound at Garden Valley Blvd
Infrastructure
Design
$2,500,000 CJ est. value
Roseburg, OR 97470

Arthur Drive Reconstruction
Infrastructure
Post-Bid
Reedsport, OR

Coos Bay Bridge Cleaning and Brushing Services
Term Contract
Post-Bid
North Bend, Umpqua, OR 97459

Pruner Road Intersection Improvements
Infrastructure
Results
$2,000,000 est. value
Roseburg, OR

US101/OR38 Curb Ramps Project
Infrastructure
Results
$2,000,000 to $5,000,000 est. value

I-5: Azalea - Glendale (Southbound)
Infrastructure
Design
$4,902,000 CJ est. value
Roseburg, OR 97470

Douglas High School Culinary Classroom
New Construction, Infrastructure - 970 SF
Post-Bid
$908,000 CJ est. value
Winston, OR 97496

OR99/OR99W/OR99E Curb Ramps Project
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
Roseburg, OR 97471

AutoZone #6128 / Sherwood
New Construction, Infrastructure - 5,000 SF
Design
$1,500,000 CJ est. value
Roseburg, OR 97470

Manage, Operate, Promote and Maintain the Fairgrounds Speedway
Infrastructure
Post-Bid
Roseburg, OR 97471

Stephens Street Curb Ramp Improvements
Infrastructure
Results
$350,000 to $400,000 est. value
Roseburg, OR

Everett and State Roadway Improvements
Infrastructure
Results
$331,000 est. value
Sutherlin, OR

Pavement Management Program Slurry Seals 2022
Infrastructure
Results
$80,000 est. value
OR

Slurry Seal - Winchester Bay 2022
Infrastructure
Results
$160,000 est. value
Roseburg, OR

Last Updated 09/21/2022 08:19 PM
Project Title

Central Avenue Sidewalk Extension - Grove to Opal

Physical Address View project details and contacts
City, State (County) Sutherlin, OR 97479   (Douglas County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $729,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

CENTRAL AVENUE SIDEWALK EXTENSION - GROVE TO OPAL Project Description: The project consists of constructing 850+/- linear feet of new six-foot wide sidewalk, including one ADA ramp and eight driveways along the south side of E. Central Avenue, from east of Grove Lane and to Opal Street. Additional forms disclosing first tier subcontractors are due by 4:00 p.m. Address Technical Questions to: Erik Ranger Bidders are not required to be pre-qualified to submit bids on this project. Bidders must be licensed with the Oregon Construction Contractors Board and comply with City of Sutherlin Municipal Code. The resulting public works contract is subject to ORS 279C.800 to 279C.870. No bid will be considered unless the bid contains a statement that the bidder will comply with the provisions of ORS 279C.840 (Prevailing Wage Rates).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents