Similar Projects
Last Updated | 12/16/2020 09:16 AM |
Project Title | North Fork Zumbro River at Mazeppa Channel Restoration |
Physical Address | View project details and contacts |
City, State (County) | Wabasha, MN (Wabasha County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Stream restoration including bank grading, installation of toe wood, installation of two new in-stream riffle structures, convert remnants of the Maple Street Dam into an in-stream riffle structure, and site restoration and seeding. · 1 LS remove concrete structures (dam remnants) · 31,405 cy common excavation (p) · 100 cy random riprap class i · 300 cy random riprap class v · 713 lf silt fence type ms · 3,200 lf sediment control log type compost · 31,000 lb hydraulic bonded fiber matrix · 1.2 acre mulch material type 1 · 400 lf toe wood · 450 each live stake |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |