Similar Projects
Pacifica of Chicago
Renovation - 280,000 SF
Conception
$40,000,000 CJ est. value
Chicago, IL 60616

Vocational Education Building Construction
New Construction - 11,500 SF
Design
$4,290,000 est. value
Geneseo, IL

Guiding Light Academy Addition
Addition, Infrastructure, Renovation
Design
$2,500,000 CJ est. value
Shorewood, IL 60404

Underground Conduit at Crabtree Nature Center
Infrastructure
Post-Bid
$25,000 CJ est. value
Barrington, IL 60010

Underground Conduit at Crabtree Nature Center
Infrastructure
Post-Bid
$25,000 CJ est. value
Barrington, IL 60010

CPS Dunne TAC Music Room
New Construction
Results
Chicago, IL 60628

2022 Capital Improvements
Renovation
Results
Addison, IL 60101

Royal University Cosmetology School
Build-Out
Pending Verification
Champaign, IL 61822

St. Boniface Redevelopment
New Construction, Infrastructure, Build-out - 100,000 SF
Pending Verification
$15,000,000 CJ est. value
Chicago, IL 60642

The Goddard School / Deerfield
Renovation, Demolition - 1,146 SF
Post-Bid
$85,000 est. value
Deerfield, IL 60015

Vaughn - Toilet Upgrades - Prequalified Various Trades Only
Renovation
Results
$18,287 CJ est. value
Chicago, IL 60641

Pui Tak Christian School
Demolition, New Construction, Infrastructure
Pending Verification
$3,100,000 CJ est. value
Chicago, IL 60616

Wilco Area Career Center Classroom Addition
Addition
Post-Bid
$500,000 CJ est. value
Romeoville, IL 60446

Morton School of Excellence and Skinner North Classical School Renovations
Renovation
Results
$10,984,800 CJ est. value
Chicago, IL 60612

Barbara Jean Wright Court Apartments Renovation
Renovation - 5,000 SF
Pending Verification
$60,000,000 CJ est. value
Chicago, IL 60604

Last Updated 04/12/2023 11:01 PM
Project Title

Install Sprinkler Systems

Physical Address View project details and contacts
City, State (County) Jacksonville, IL 62650   (Morgan County)
Category(s) Education
Sub-Category(s) Vocational School
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Project Consists of Installation of a Fire Suppression System in the Administration Building, V0204. Work Includes Installation of Fire Sprinkler Heads and Piping, Standpipe System, Fire Pump and Jockey Pump System, Installation of New Water Service, Installation of New Generator and Service Transformer, and Construction of a Fire Pump Room Enclosure. Single Prime Delivery Method: Either the Single Prime Bidder or a Protected Subcontractor Must Be Listed for Each Trade Provided on the Bid Form. Only One Protected Subcontractor May Be Listed for Each Trade. Failure to Identify the Name and Bid Proposal Cost of Each Listed Protected Subcontractor on the Provided Bid Form or Providing More Than One Protected Subcontractor for Each Trade Will Be a Material Deficiency (No Time Will Be Allowed After Bid Opening to Remedy Deficiency) and Will Result in the Rejection of the Bid. All Protected Subcontractors Listed Must Be Prequalified With Cdb in Accordance With Cdb Standard Documents for Construction, Article 00 21 05. BID SECURITY: Bid security must be submitted with each bid equal to 10% of the base bid and must be in the form of a CDB bid bond, certified check, cashier's check or bank draft. Refer to Article 00 43 13 of the Standard Documents for Construction . CONTRACT TIME: Refer to Articles 00 72 10 and 01 32 00 of the Standard Documents for Construction. SPECIAL NOTICE - DEADLINE FOR COMPLETION. Contractor shall commence work immediately upon receipt of the Authorization to Proceed and shall complete all work through Substantial Completion in accord with the contract no later than March 31st 2024 . The contractor shall complete all work in accordance with the contract (Final Acceptance) within 30 consecutive calendar days from the date of Substantial Completion. PRE-BID CONFERENCE. The pre-bid meeting will be as indicated in 00 11 13. Bidders are strongly urged to attend this meeting. See SDC 00 21 10 and 00 25 00. THE CONDITION OF THIS OBLIGATION is that if Principal, upon acceptance by Obligee of its bid within the period of time specified for acceptance, shall comply with all post award requirements as required by the terms of the bid within the time specified after date of the Notice of Award, or in the event of the failure to comply with all post award requirements, if Principal shall pay Obligee (1) for all costs of procuring the work which exceeds the amount of its bid, or (2) shall pay Obligee the amount of this bond as liquidated damages in the event Principal is a sole bidder and after an attempt to secure other bids by readvertising none can be obtained, then this obligation shall be null and void; otherwise it shall remain in full force and effect.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents