Last Updated | 04/12/2023 11:01 PM |
Project Title | Install Sprinkler Systems |
Physical Address | View project details and contacts |
City, State (County) | Jacksonville, IL 62650 (Morgan County) |
Category(s) | Education |
Sub-Category(s) | Vocational School |
Contracting Method | Competitive Bids |
Project Status | Bidding, Request for Qualifications, Construction start expected July 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $1,500,000 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Description: Project Consists of Installation of a Fire Suppression System in the Administration Building, V0204. Work Includes Installation of Fire Sprinkler Heads and Piping, Standpipe System, Fire Pump and Jockey Pump System, Installation of New Water Service, Installation of New Generator and Service Transformer, and Construction of a Fire Pump Room Enclosure. Single Prime Delivery Method: Either the Single Prime Bidder or a Protected Subcontractor Must Be Listed for Each Trade Provided on the Bid Form. Only One Protected Subcontractor May Be Listed for Each Trade. Failure to Identify the Name and Bid Proposal Cost of Each Listed Protected Subcontractor on the Provided Bid Form or Providing More Than One Protected Subcontractor for Each Trade Will Be a Material Deficiency (No Time Will Be Allowed After Bid Opening to Remedy Deficiency) and Will Result in the Rejection of the Bid. All Protected Subcontractors Listed Must Be Prequalified With Cdb in Accordance With Cdb Standard Documents for Construction, Article 00 21 05. BID SECURITY: Bid security must be submitted with each bid equal to 10% of the base bid and must be in the form of a CDB bid bond, certified check, cashier's check or bank draft. Refer to Article 00 43 13 of the Standard Documents for Construction . CONTRACT TIME: Refer to Articles 00 72 10 and 01 32 00 of the Standard Documents for Construction. SPECIAL NOTICE - DEADLINE FOR COMPLETION. Contractor shall commence work immediately upon receipt of the Authorization to Proceed and shall complete all work through Substantial Completion in accord with the contract no later than March 31st 2024 . The contractor shall complete all work in accordance with the contract (Final Acceptance) within 30 consecutive calendar days from the date of Substantial Completion. PRE-BID CONFERENCE. The pre-bid meeting will be as indicated in 00 11 13. Bidders are strongly urged to attend this meeting. See SDC 00 21 10 and 00 25 00. THE CONDITION OF THIS OBLIGATION is that if Principal, upon acceptance by Obligee of its bid within the period of time specified for acceptance, shall comply with all post award requirements as required by the terms of the bid within the time specified after date of the Notice of Award, or in the event of the failure to comply with all post award requirements, if Principal shall pay Obligee (1) for all costs of procuring the work which exceeds the amount of its bid, or (2) shall pay Obligee the amount of this bond as liquidated damages in the event Principal is a sole bidder and after an attempt to secure other bids by readvertising none can be obtained, then this obligation shall be null and void; otherwise it shall remain in full force and effect. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |