Similar Projects
Norton Creek Flood Control - 603-60-22524 - City of Fridley
Infrastructure
Conception
$900,000 CJ est. value
Fridley, MN 55432

Anoka Metro Regional Treatment Center Miller Building Upgrade
Build-out, Renovation, Infrastructure
Conception
$6,600,000 CJ est. value
Anoka, MN 55303

Snow Plowing Services
Term Contract
Design
Anoka, MN 55304

Bridge Repair
Infrastructure
Design
$2,300,000 CJ est. value
Spring Lake Park, MN 55432

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Road Right-of-Way Maintenance Equipment
Infrastructure
Post-Bid

Zinc Coated Ductile Iron Pipe
Term Contract, Infrastructure
Post-Bid
Minneapolis, MN

2021 Water System Looping Improvements
Renovation
Results
$180,000 to $210,000 est. value
Minneapolis, MN

Regional Trails and Pathways Rehabilitation
Renovation
Results
Minneapolis, MN

Andover High School Storage Garage Addition
Addition, Renovation, Infrastructure
Construction
$197,440 CJ est. value
Andover, MN 55304

Radisson Hills
New Construction, Infrastructure
Construction
$18,000,000 CJ est. value
Blaine, MN 55449

Riverdale Commons Seventh Addition / Golden Corral Redevelopment
Demolition, New Construction, Infrastructure - 8,900 SF
Pending Verification
$2,800,000 CJ est. value
Minneapolis, MN 55448

Sanctuary Lofts
New Construction, Infrastructure, Build-out
Pending Verification
$6,600,000 CJ est. value
Minneapolis, MN 55417

Bunker Hills Regional Park Improvements - Anoka County
Infrastructure
Conception
$5,525,589 CJ est. value
Andover, MN 55304

Last Updated 12/28/2022 05:33 PM
Project Title

Creek Valley Street Reconstruction

Physical Address View project details and contacts
City, State (County) Ham Lake, MN 55304   (Anoka County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $1,365,899 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Site Directions: 145th Avenue from 230 ft north of 144th Lane to CDS, London Street from 145th Avenue to CDS, Kenyon Street from 216 ft north of 144th Lane to 145th Avenue, and 146th Avenue from Radisson Road (CR 52) to CDS Creek Valley Street Reconstruction (145th Avenue from 230 ft north of 144th Lane to CDS, London Street from 145th Avenue to CDS, Kenyon Street from 216 ft north of 144th Lane to 145th Avenue, and 146th Avenue from Radisson Road (CR 52) to CDS), Ham Lake City Project 2105, located in Ham Lake, Minnesota. The project consists of the following approximate quantities of major items: 2,807 C.Y. Common Excavation 12,507 S.Y. Reclamation of existing bituminous surface 795 tons Type SPWEA240C Wearing Course Mixture 1,590 tons Type SPWEB240C Wearing Course Mixture 3,326L.F. Storm Drain 37 Each Storm Drain Structures 8,218 L.F. Concrete Curb and Gutter Along with related appurtenances, items and turf establishment. Each bid must be accompanied by cash, a cashiers check or a certified check, or by a bid bond duly executed by the Bidder as principal and having as surety thereon a company qualified to act as surety in the State of Minnesota, for not less than five percent (5%) of the total amount of the bid, payable without condition to the City of Ham Lake, Minnesota. The City of Ham Lake will not accept a performance bond or payment bond that requires that funds for payment to the Contractor be placed with an escrow company for disbursement. The City of Ham Lake will disburse all Contractor draws directly. The City Council reserves the right to reject any and all bids and to waive any informality in any bids received without explanation. No bid may be withdrawn for a period of forty-five (45) days after the actual date of the bid opening. By order of the City Council of the City of Ham Lake, Minnesota.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents