Similar Projects
Holt Fire Station
New Construction - 2,774 SF
Conception
$813,000 est. value
Holt, FL

Longwood Fire Station 15/Public Safety Facility
New Construction
Conception
Longwood, FL 32750

Brickell City Centre Fire Station - Shell
New Construction - 6,500 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Miami, FL

Fire Station 11
New Construction
Design
Orlando, FL

Prequalification of Companies to Bid Construction Services for the Police Department (PD) Headquarters Building
New Construction - 76,390 SF
Bidding
Melbourne, FL

Medart Fire Department Building Renovation
Renovation
Bidding
Crawfordville, FL 32327

Austin Tindall Fire Station
New Construction - 112,290 SF
Sub-Bidding
$10,000,000 CJ est. value
FL

Clearwater Police Department District 3 Substation
Renovation - 27,000 SF
Post-Bid
Clearwater, FL

Fire Station 21 Renovation
Renovation - 5,000 SF
Post-Bid
Less than $2,330,000 est. value
Venice, FL 34285

Sheriff`s District 2 Administration and Operations Center
New Construction - 51,000 SF
Results
Less than $21,000,000 est. value
Bunnell, Palm Coast, FL 32137

Fire Department Living Quarters Renovation
Renovation
Results
Less than $33,735 est. value
Umatilla, FL 32784

Winter Haven Fire Station No. 3 / Public Safety Facility
New Construction
Construction
Winter Haven, FL

Construction of Bonaventure Fire Rescue Station No. 21
New Construction - 12,578 SF
Construction
Less than $5,250,000 est. value
Weston, FL 33326

Rebuilding of Fire Station 31
Renovation
Pending Verification
$10,900,000 est. value
Panama City Beach, FL

New Public Safety Complex
New Construction
Pending Verification
$21,635,000 est. value
Apopka, FL

Last Updated 03/22/2022 12:36 PM
Project Title

New Police Department

Physical Address View project details and contacts
City, State (County) Palmetto, FL 34221   (Manatee County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method
Project Status Construction Commenced first quarter 2022, Construction Completion Expected second quarter 2023
Bids Due View project details and contacts
Estimated Value $8,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

To provide Pre-construction and construction phase services for the development of the new city of Palmetto Police Department building.

Details

,, 24,572 SF - 1 Fire/Police Station, Approximately 23,172 SF New Construction, 1, Approximately 1,400 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents