Similar Projects
Saratoga Springs Lake Mountain Zone 2 South Pond and Losee Canyon Debris
Bidding
Saratoga Springs, UT

Sunbrook Golf Course Drainage
Bidding
Saint George, UT 84770

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

UDOT Culvert Cleaning and Video Contract
Term Contract
Post-Bid

Dry Creek Improvements
Results
Less than $1,000,000 est. value
Sandy, UT

Hiawatha Project Phase 2: Culvert Stabilization
Results
$140,000 to $150,000 est. value
Hiawatha, UT

Ashley Upper and Highline Canals Rehabilitation Project/CMAR
Construction
Less than $34,000 est. value
UT

500 East 600 South Design
Post-Bid
Salem, UT 84653

Zone 3 North 3 MG Reservoir Project
Results
Less than $3,200,000 est. value
West Jordan, UT 84088

Remove and Replace Approximately 110` of 14” Irrigation Culvert or Pipe
Post-Bid
Hinckley, UT 84635

Jenkins Flat Pond for Juab County
Results
Less than $50,000 est. value
Nephi, UT 84648

Replacement of the Existing Water Diversion Structure of the Bench Canal Heading
Post-Bid
Duchesne, UT

Hooper Slough Box Culvert Project
Results
$150,000 to $200,000 est. value
West Haven, UT 84401

The East Bay Golf Course Pond Banks Renewal Project
Post-Bid
Provo, UT 84606

Manganese Road Culvert
Results
Less than $50,000 est. value
Saint George, UT 84770

Reported 03/12/2020 12:00 AM
Project Title

Stormwater Runoff and Flood Mitigation Project

Physical Address View project details and contacts
City, State (County) Snowville, UT 84336   (Box Elder County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 02/21/20
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of essentially five sub-projects consisting of (1) repairing and extending Potters Hollow 48-inch culvert in Stone Road, (2) removing, realigning and reconstructing a 140-foot long valley gutter adjacent Stone Road, (3) constructing a pipe and swale storm drainage system along Main Street, (4) extending Deep Creek`s 60-inch culvert; and, (5) constructing a concrete flood diversion structure in the ditch along 600 North Street. Work includes but is not limited to furnishing all necessary labor, materials, equipment and services to complete the work in its entirety.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents