Similar Projects
30th St And Kessler Blvd Area Drainage Improvements
Design
$3,600,000 est. value
Indianapolis, IN 46222

Mooresville and Mills Road Drainage Improvements
Design
Indianapolis, IN 46221

Bridge Replacement and Bank Stabilization in Brookshire Golf Club
New Construction
Bidding
Less than $1,000,000 est. value
Carmel, IN

Wisconsin Street and Alton Avenue Drainage Improvements
Bidding
$500,000 to $600,000 est. value
Indianapolis, IN 46225

Mississinewa Retreat Channel Repair
Post-Bid
$1,000,000 to $5,000,000 est. value
Peru, IN 46970

Trench Box Rental
Post-Bid
Indianapolis, IN 46077

Box Culvert Replacement and Debris Removal from Channel
Results
IN

Small Structure Pipe Lining
Results
IN

Culvert Replacement Asset PA2287 at 5000 Todd Road
Design
Indianapolis, IN 46237

Small Structure Pipe Lining
Bidding

48" Precast Reinforced Concrete Pipe
Post-Bid
Indianapolis, IN 46077

Bridge Painting and Small Structure Pipe Lining
Results

Small Structure Replacement and Scour Protection
Bidding
IN

West Aircraft Apron - Division A Grading and Drainage
Post-Bid
Kentland, IN 47951

Scour Protection
Results
IN

Last Updated 12/17/2020 03:57 PM
Project Title

Monon Ditch Encapsulation

Physical Address View project details and contacts
City, State (County) Carmel, IN 46032   (Hamilton County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is for the construction of a Monon Ditch Encapsulation along the Monon Trail north of Gradle Drive. The encapsulation will consist of the installation of 325 LFT of 72” RCP and 15 LFT of 9’ x 7’ Reinforced Concrete Box extension with CIP headwall connection. The project will also install 12 LFT of 36” RCP, 11 LFT of 30” RCP, 18 LFT of 12” RCP, and 920 LFT of maintenance ditch dredging (one-step removal) and associated tree removal. The runoff from the encapsulation project site will follow existing drainage patterns in the existing ditch.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents